Issue Date:
2022-01-13
Page 4 of 7
Report Reference #
E521573-A6025-UL
Revision Date: 2022-07-18
1
4
BD1.0
TABLE: Production-Line Testing Requirements
BD1.1
Electric Strength Test Special Constructions – Refer to Generic Inspection Instructions,
Part AC for further information.
Model
Component
Removable parts
Test probe
location
Test V rms
Test V
dc
Test
Time, s
N/A
--
--
--
--
--
--
Earthing Continuity Test Exemptions – This test is not required for the following models:
BD1.2
All Model
Electric Strength Test Exemptions – This test is not required for the following models:
BD1.3
All Model
Electric Strength Test Component Exemptions – The following solid-state components
may be disconnected from the remainder of the circuitry during the performance of this
test.
BD1.4
N/A
BE1.0
Sample and Test Specifics for Follow-Up Tests at UL
Model
Component
Material
Test
Sample (s)
Test Specifics
N/A
--
--
--
--
--
Содержание WV-S1136
Страница 10: ...Photographs 02 Page 1...
Страница 11: ...Photographs 03 Page 1...
Страница 12: ...Photographs 04 Page 1...
Страница 13: ...Photographs 05 Page 1...
Страница 14: ...Photographs 06 Page 1...
Страница 15: ...Photographs 07 Page 1...
Страница 25: ...Photographs 02 Page 1...
Страница 26: ...Photographs 03 Page 1...
Страница 27: ...Photographs 04 Page 1...
Страница 28: ...Photographs 05 Page 1...
Страница 29: ...Photographs 06 Page 1...
Страница 30: ...Photographs 07 Page 1...