
Hardware Manual
BMS Master 4 / 4.5
Ref.: IR14417 A 15.01.2018
Page 69/76
4.
B
RINGING THE
S
LAVE
C,
S
LAVE
5
INTO
S
ERVICE
(
ONLY FOR
C
ELL
V
OLTAGES
)
A startup example of Slave5 and Slave C is represented.
Slave_5
Slave_C
After connecting the cell plugs to the battery it has to be controlled whether all wires have
the proper contact to the cells (screws tight?) and the cabling is correct. With a wrong
connection the Slave may be destroyed — ACTIA I+ME will disclaim all warranties. So it is
strongly recommended to measure all voltages at each cell plug before connecting it to the
Slave. The pictures show the connections of a 10-cell battery to Slave_5 rsp. of an 8-cell
battery to Slave_C.
The MASTER has to be connected to the supply and a switch to the drive input. The first
Slave has to be connected via RS485 interface to the SlaveCom interface of the MASTER
and the checked cell plug has to be plugged on the Slave. The MASTER has to be connected
to a PC via RS232 interface and the Monitor program to be started. After switch-on the
Drive input, the display of the cell voltages shall confirm the function of the Slave and of the
RS485 interface.
VBAT+
VBAT-
18
13
5
1
24-pol Conn.
12 11 10 9 8 7 6 5 4 3 2 1
8-cell-wiring
VBAT+
VBAT-
Содержание BMS Master 4
Страница 14: ...Hardware Manual BMS Master 4 4 5 Ref IR14417 A 15 01 2018 Page 14 76 3 1 2 ENCLOSURE VIEWS Front Rear...
Страница 73: ...Hardware Manual BMS Master 4 4 5 Ref IR14417 A 15 01 2018 Page 73 76 6 CERTIFICATES...
Страница 74: ...Hardware Manual BMS Master 4 4 5 Ref IR14417 A 15 01 2018 Page 74 76...
Страница 75: ...Hardware Manual BMS Master 4 4 5 Ref IR14417 A 15 01 2018 Page 75 76...
Страница 76: ...Hardware Manual BMS Master 4 4 5 Ref IR14417 A 15 01 2018 Page 76 76...