Turn on the water supply and flush out all the debris from the
water supply pipe.
Step 6
Close the control stop by turning the adjustment screw
CLOCKWISE
.
Turn the adjustment screw on the control stop
COUNTERCLOCKWISE
to ensure the control stop is fully
opened.
Step 4
page 5
Step 5
I-CON Systems, Inc., for product support call 1-866-730-7192 or visit us online at support.i-con.com
Continued Next Column
Continued on Next Page
Step 8
Reinstall the flushometer cap (hand-tighten only) Over tightening
may cause O-Ring to pinch.
Step 7
Remove the flushometer cap and insert the trip mechanism
and ProLAST
®
.
I-CON COBALT
™
Manual Exposed Flush Valve
powered by ProLAST
®
Installation Instructions
VLV-FVL-MN3000 Series
Rev 022719