3. LOADING THE MACHINE
1)
Load and unload the machine on a flat ground.
2)
Use the gangplank with sufficient length, width,
thickness and gradient.
3)
Move slowly and carefully when the machine is
on the gangplank.
Do not change the direction of the machine
while it is on the gangplank.
4)
Do the following after loading the machine to
the trailer.
(1) Lower the working equipment gently after
the location is determined.
Place a rectangular timber under the
bucket cylinder to prevent it from being
damaged during transportation.
Do not operate any other device when
loading.
Balance the load.
5-3
Содержание HL930A
Страница 1: ...WHEEL LOADER OPERATION MAINTENANCE MANUAL HL930A HL930A XT Serial No ...
Страница 2: ......
Страница 4: ......
Страница 25: ...1 CALIFORNIA PROPOSITION 65 SAFETY HINTS 1 1 ...
Страница 133: ...13 REAR CAMERA option 1 The rear camera is available as a option Refer to page 3 39 3 75 ...
Страница 147: ...15 CAMERA MONITOR OPTION 3 89 ...
Страница 149: ... 2 Interlocked with other devices 3 91 ...
Страница 150: ... 3 Operation scenario Single camera mode 3 92 ...
Страница 151: ... 4 Operation scenario AAVM mode 3 93 ...
Страница 152: ... 5 AAVM view mode type 3 94 ...
Страница 153: ... 6 Function menu tree Single cam mode 3 95 ...
Страница 154: ... 7 Function menu tree AAVM mode 3 96 ...
Страница 155: ... 8 Parking guide line adjust 3 97 ...
Страница 156: ... 9 How to set function menu 3 98 ...
Страница 157: ... 10 Composition of menu screen 3 99 ...
Страница 158: ... 11 Value adjustment 3 100 ...
Страница 159: ... 12 When radar mounted monitor display 3 101 ...
Страница 160: ......
Страница 191: ...6 Block the tires and fix firmly with wire rope or chain to prevent the machine from moving dur ing transportation 5 5 ...
Страница 260: ...9 2 ...
Страница 261: ......
Страница 262: ...EN English E1 September 2020 PART NO 91WA 32040 ...