7
4
3
1
2
5
•
Drawer Detail Part List and Drawing
(Listado de piezas y diagrama detallado del cajón)
Ref. # Description
Rubber Vibration Mount - 1-1/2"
Pull Handle
Impact Top Channel
Single Drawer Assembly
Impact Weld - 48"
Страница 1: ...RAY Manual de Instalaci n y Mantenimiento con Informaci n sobre Seguridad y Lista de Refacciones LAS REFACCIONES RECOMENDADAS SE RESALTAN EN GRIS IMPORTANT DO NOT DESTROY IMPORTANTE NO DESTRUIR HYTROL...
Страница 2: ...number of items received against the bill of lading 2 Examine condition of equipment to determine if any damage occurred during shipment 3 Move all crates to area of installation 4 Remove crating and...
Страница 3: ...rrying personnel Under no circumstances shall any person ride on any element of a vertical conveyor E Personnel working on or near a conveyor shall be instructed as to the location and operation of pe...
Страница 4: ...he roller needing replaced and using pliers pull the lacing pin from the end of the section through other hex shafts until the roller needing replaced is free to remove 2 Repeat on the other side of t...
Страница 5: ...Block MHS Support Center Leg Support 1 9 Roller Tube Assembly 4 125 1 9 Galvanized Roller Assembly 22 6 7 8 9 10 25 Roller 45 HS 04 34 Support Assembly 4 Lane Finger Assembly 6 0 Side Channel Weld Bed...
Страница 6: ...ck MHS Support Center Leg Support 1 9 Galvanized Roller Assembly 4 125 1 9 Galvanized Roller Assembly 22 6 7 8 9 10 25 Roller 45 HS 04 34 Support Assembly 4 Lane Finger Assembly 7 0 Side Channel Weld...
Страница 7: ...5 Drawer Detail Part List and Drawing Listado de piezas y diagrama detallado del caj n Ref Description 1 2 3 4 5 Rubber Vibration Mount 1 1 2 Pull Handle Impact Top Channel Single Drawer Assembly Impa...
Страница 8: ...bicaci n o posici n La lejan a de la presencia frecuente de p blico o del personal empleado constituir una protecci n por ubicaci n Cuando el transportador pasa sobre un pasillo calzada o estaci n de...
Страница 9: ...y pivotantes Apriete los pernos solo con la mano 4 Compruebe que el transportador est nivelado a lo largo del ancho y largo de la unidad Ajuste los soportes seg n sea necesario MANTENIMIENTO C mo ree...
Страница 10: ...Componente Suggested Action Sugerencia Schedule Horario Weekly Semanal Monthly Mensual Quarterly Trimestral Rollers Rodillos Check for Wear Revisar el desgaste Check Noise Revisar el ruido Structural...