S826/6
FLOAT SWITCH INSTALLATION DIAGRAM
FLOAT SWITCH ACTIVATION AND CONFIGURATION
6. Connect the float switch cables to the float switch terminals inside the
alarm box as per connections diagram.
7. After connecting the desired amount of float switches, activate the
corresponding channels by setting the appropriate channel activation
dipswitch to "ON" position. See Dip switch settings diagram.
NB: If a channel activation dipswitch is in the "OFF" position and a
float switch connected to the corresponding terminals is operated,
the alarm will not function.
8. Set the high/low level dipswitches to the appropriate position (NORM =
high level activation, INVERT = low level activation) to enable the
corresponding float switches to detect either a high or low-level situation.
See Dip switch settings diagram.
Содержание TA3A.B
Страница 9: ...S826 6 FITTING DIMENSIONS ...
Страница 11: ...S826 6 OUTSIDE VIEW 2 4 5 6 8 1 3 TA3A P 230V AC SHOWN ...