Site Selection 

 
Water Flow measurements are intended to be representative of the actual water running out of 
the pipe.  Some of the more important factors which influence the representativeness of a 
gauge are as follows: 
 

 

Site the gauge on a level surface.   

 

Site should have adequate protection from strong winds. 

 

Water coming out of the pipe should not contain any particles that 
could block the collector. 

 

Provide suitable ground surface to avoid splashing into the gauge. 

 
 
 

ii.

 

Setting up 

 

 

Install the gauge on a suitable bracket or shelf, as suggested in 
Diagram 1,2 & 3. 

 

 

The gauge is provided with a level.  Proceed to level by ensure the 
bracket the gauge is mounted on is level 

 

 

Connect lead to the Flow gauge terminals, in accordance with Diagram 
3, and to the recording device, in accordance with manufacturer’s 
instruction manual. 

 

 

V.

 

TEST OPERATION 

 

 

Manually tip the bucket a number of times, ensuring that each tip is 
being recorded and that the tilting mechanism is operating freely. 

 
 
 

VI.

 

MAINTENANCE 

The only routine maintenance required is cleaning.  The following items should be checked 
regularly for cleanliness: 
 

 

Collector area

 

 

Interior of bucket

 

 

Top surface of adjusting screws 

 

Lubrication of the pivot using (WD40 or equivalent) 

 
 

 

Содержание TB1L

Страница 1: ...016 HYQUEST SOLUTIONS PTY LTD 48 50 Scrivener St Warwick Farm NSW 2170 AUSTRALIA Phone 61 2 9601 2022 Fax 61 2 9602 6971 Email sales hyquestsolutions com au Web www hyquestsolutions com au INSTRUCTION...

Страница 2: ...pping Bucket Flow Gauge TB1L 100 02 Issue 1 26 9 2016 Table of Contents I GENERAL 3 II UNPACKING YOUR TB1L FLOW GAUGE 3 III SPECIFICATION 4 IV INSTALLATION 5 V TEST OPERATION 7 VI MAINTENANCE 7 VII EL...

Страница 3: ...ng one of the HyQuest Solutions data loggers to a GSM or Satellite Event logging with our Data Logger Optional Telemetry options available on request Connect to display Counter Optional II UNPACKING Y...

Страница 4: ...re min 6 5 0 litre min 10 10 0 litre min 14 15 0 litre min 18 20 0 litre min 20 25 0 litre min 22 Humidity 0 to 95 Temperature 20 to 70o C Contact system dual reed switches potted in soft silicon rubb...

Страница 5: ...STALLATION The TB1L installation requirements are dependant site conditions The user needs to ensure no water is lost outside the area of the collector DIAGRAM 1 Water Pipe Collector Stop Adjusting Sc...

Страница 6: ...exceed the 75mm 2 5 and is installed in the centre of the flow gauge as shown in figures above DIAGRAM 2 Note It is advisable to have a vented cover above the collector of the flow gauge to avoid wat...

Страница 7: ...ii Setting up Install the gauge on a suitable bracket or shelf as suggested in Diagram 1 2 3 The gauge is provided with a level Proceed to level by ensure the bracket the gauge is mounted on is level...

Страница 8: ...elemetry circuit Parallel connection of both switches increases the current carrying capacity of the contact system if required Parallel switch operation confers a degree of redundancy in locations wh...

Страница 9: ...2016 Input 1 Input 2 IV APPLICATIONS Each signal from this reed switch indicates a 0 5L or 1L of water flow depending on bucket size 2x Digital inputs with maximum capacity of 24 Volts 0 5amp max They...

Отзывы: