Hypontech HPT Series Скачать руководство пользователя страница 29

 

29  HPT USER MANUAL 

11 

Grid frequency 

exceeds the 

permissible range 

grid frequency exceeds the 

Safety regulations 

⒈If it happens occasionally, it belongs to the short-time 

abnormality of the power grid, the inverter will return to normal 

operation after detecting the normal power grid, and there is no 

need to deal with it.   

2. In case of frequent occurrence but automatic recovery, please 

confirm if the grid voltage is outside the permissible range due to 

local grid conditions, try to modify the values of the monitored 

operational limits after informing the electric utility company first.   

⒊If it cannot be recovered for a long time, please confirm:   

①whether the AC circuit breaker is disconnected   

②whether the AC terminal is in good connection   

③whether the power supply line is normal 

④  whether the safety regulation settings are normal 

12 

DC component of 

the electricity 

exceeds the 

permissible range 

the current exceeds 1A in 

stastic state and 4A in 

dynamic state 

Disconnect the inverter from the utility grid and the PV array, and 

reconnect it after LED turns off. If this fault is still being displayed, 

please contact the service. 

13 

EEPROM Error, e.g. 

transition 

disturbance 

Micro CPU read EEPROM 

failed 

Disconnect the inverter from the utility grid and the PV array, and 

reconnect it after LED turns off. If this fault is still being displayed, 

please contact the service. 

14 

Internal 

communication 

fault 

Master CPU communicate 

with slave CPU abnormal 

Disconnect the inverter from the utility grid and the PV array, and 

reconnect it after LED turns off. If this fault is still being displayed, 

please contact the service. 

15 

Bus-voltage too 

high 

Bus-voltage is greater than 

1030V 

Check the open-circuit voltages of the strings and make sure it is 

below the maximum DC input voltage of the inverter.   

If the input voltage lies within the permissible range while the 

fault occurs, please contact the service. 

Содержание HPT Series

Страница 1: ......

Страница 2: ...HPT Series 3 Phase Grid tied Solar Inverters USER MANUAL...

Страница 3: ...on 11 5 3 DC Wire Assembly and Connection 12 5 4 Residual Current Protection 12 6 COMMUNICATION 13 6 1 System monitoring via Datalogger RS485 Wi Fi GPRS Optional 13 6 2 Output Efficiency Control via S...

Страница 4: ...rsons who are responsible for mounting installation commissioning maintenance tests and service of HYPONTECH inverter products must be suitably trained and qualified for corresponding operations They...

Страница 5: ...ter could cause lethal electrical shocks Before proceeding any work including maintenance and or service on the inverter fully disconnect it from all DC input AC grid and other voltage sources There M...

Страница 6: ...HPT USER MANUAL 6 3 2 Product Overview 1 LED LCD or LED 2 DC Switch 3 PV Terminal s 4 COM1 Wi Fi GPRS Optional 5 COM2 RS485 METER DRED 6 Secondary PE Terminal 7 AC Terminal...

Страница 7: ...than 45 5 When installing in residential or domestic environment it is recommended to install and mount the inverter on a solid concrete wall surface Mounting the inverter on composite or plaster boar...

Страница 8: ...r 15 backwards Please mount the inverter on a vertical wall surface 4 DO NOT mount the inverter on any surfaces tilting forward or to either sides 5 DO NOT mount the inverter on a horizontal surface 6...

Страница 9: ...to ensure its stably attached 4 Use M5 screws T25 screwdriver torque 2 5 Nm to attach the heat sink fins to the mounting bracket 5 It is recommended to attach the anti theft lock to the inverter Lock...

Страница 10: ...the frequency and voltage of grid connection and make sure they follow the inverter s grid connection specifications 2 An external circuit breaker on the AC side or a fuse at 1 25 AC rated current is...

Страница 11: ...Switch Types Please install an individual 2 stage miniature circuit breaker according to the following specifications Model Maximum output current A AC Breaker Rated current A HPT 3000 5 16 HPT 4000...

Страница 12: ...n of PV arrays 5 The polarity of the PV arrays MUST be compatible to the DC connectors of the inverter 6 The DC input voltage AND DC input current of the PV array MUST never exceed the maximum input a...

Страница 13: ...nd tighten 3 For user guidance and configuration of Datalogger please refer to the corresponding HYPONTECH Wi Fi Stick Guide manual which is available in printed form inside Documents pack or an onlin...

Страница 14: ...ut to prevent the cable from wobbling Step 5 Put on the COM sealing plate and firmly tighten the screws to prevent moisture and dust Screwdriver type T25 Torque 2 5 Nm When installing RS485 the COM se...

Страница 15: ...tion 50 rated power DRM 3 Power consumption 75 rated power AND respond to reactive power when capable DRM 4 Increase power consumption prior subject to constraints from other active DRMs DRM 5 No powe...

Страница 16: ...Moistures and Dust will damage the inverter Secure and tighten the screws on COM sealing plate Warranty will be void if the inverter is damaged due to moisture and dust caused by poor installation of...

Страница 17: ...nd if the AC connector is properly and securely installed Check if the AC connector is firmly plugged into AC terminal 6 Cables Check if all cables are reliably connected Check if the connections are...

Страница 18: ...HPT USER MANUAL 18 7 2 Inverter LED Indicators When the inverter operates LED symbols on display have the following meanings...

Страница 19: ...19 HPT USER MANUAL 7 3 Display and Control Logics When inverter starts up and operates there is a control button beside LCD Display of the inverter Please follow the logics listed below...

Страница 20: ...om closing unintentionally 3 Use clamps to ensure there is no electrical current in DC wires 4 Disconnect all DC connections and resources Unplug the DC connectors and DO NOT pull the cables 5 Use mul...

Страница 21: ...21 HPT USER MANUAL 9 TECHNICAL PARAMETERS...

Страница 22: ...HPT USER MANUAL 22...

Страница 23: ...23 HPT USER MANUAL...

Страница 24: ...HPT USER MANUAL 24...

Страница 25: ...led Reactive power mode Default Disabled Characteristic power factor curve for cos P Default Disabled Note The power quality modes can be enabled or disabled via our monitoring APP or Web Please refer...

Страница 26: ...played on the inverter s screen or on the Hypontech s monitoring App Web the red LED will light up The corresponding corrective measures are as follows Error Code Fault Name Description Corrective Mea...

Страница 27: ...ithin the permissible range while the fault occurs please contact the service 6 Surface insulation resistance error In the process of power on and start up the insulation impedance of PV and PV to gro...

Страница 28: ...wer supply line is normal If this fault is still being shown contact the service 10 Grid voltage exceeds the permissible range grid voltage exceeds the Safety regulations If it happens occasionally it...

Страница 29: ...f the electricity exceeds the permissible range the current exceeds 1A in stastic state and 4A in dynamic state Disconnect the inverter from the utility grid and the PV array and reconnect it after LE...

Страница 30: ...ge while the fault occurs please contact the service 17 DRM S9 Error DRM switch S9 fault Check the connection of DRM device If the DRM device is connected normally while this fault occurs please conta...

Страница 31: ...meters are normal during operation Half a year Commissioning Check if the cables are loose Check if the cable insulations are damaged especially the parts in contact with metal surfaces Half a year af...

Страница 32: ...6 when applicable e g DC Wires need to be reassembled Please run safety checks as described in Section 7 before closing the DC Switch and starting up again 13 CERTIFICATES Grid Standards EN50549 1 AS...

Отзывы: