
Seite 15
Wall clearances
When mounting the steam humidifier, the
wall clearances shown in the fig. below must
be obeyed:
Mounting principle
For wall mounting drill measures, please
consult the table above (measure A). In case
of no suitable wall available for mounting the
unit, it is recommended that installation is
made on brackets firmly anchored in the
floor.
»
mark the holes for the upper sus-
pension brackets
screws
»
drill holes and dowel
»
screw in the supplied mounting
screws; let the screws protrude
approx. 12 mm
/
.5 inch from wall
»
ensure firm fixation and load-carry-
ing capacity of the mounted screws!
»
hook in the unit and ensure safe
suspension
»
mark the holes for the lower suspen-
sion brackets screws
»
remove the unit
»
drill holes and dowel
»
hook in the unit and mount the lower
screws firmly
To function properly, the steam humidifier
must hang level and plumb.
>500/19.7
>200/7.8
>300/11.8
>50/2.0
device rear
suspension brackets
all measures in mm/inch
Содержание StandardLine Series
Страница 16: ...Seite 16 Device connections cable entries waste water connection water inlet steam outlet device front...
Страница 78: ...Page 78 13 Declaration of conformity...
Страница 82: ...Page 82 This page intentionally left blank...
Страница 83: ...Page 83 This page intentionally left blank...
Страница 85: ...Page 85 17 View of housing 70 56 57...