5.2 Unit Installation Check
Before start-up, pls. check proper unit instal-
lation following the list below:
Unit perpendicularly aligned in both
the vertical and horizontal axis ?
All clearances obeyed?
Steam hose installed with a 5 - 10 %
minimum incline/decline (see chap-
ter "Steam line“) ?
Condensate hose features a loop
functioning as a steam barrier (see
chapter „Condensate hose“) ?
Steam manifold(s) properly positio-
ned?
All bolts and clamps properly tighte-
ned?
Steam manifold(s) horizontally mon-
ted and suspended on the free end,
if required ?
All seals (o-rings) in place?
All ventilation slots on housing top
unobscured?