background image

www.hygiena.com

DIAG-TB-2157-REVA

Swap of Q7 Cycler ONLY

1. 

Follow Pre-Installation Site Requirements and Unpacking and Installation Sections prior to 

swap out.

2. 

Before removing the BAX

®

 Q7 to be swapped out, insert the plastic shipping tray (this 

should have been saved from the time of install) and use the manual block control in the 

diagnostics>cycler tab to raise the block. Power down the machine without lowering the 

block. This secures the block for shipping.

a. 

If the shipping tray is not available, one will be in the new BAX

®

 System Q7. To remove that 

tray, connect the BAX

®

 System Q7 to a power source and turn on the machine. This will 

automatically lower the block, an audible sound will occur, and the In-Use light will turn off 

when the block is lowered. Open the drawer and remove the shipping tray.

3. 

Swap the BAX

®

 System Q7 units by disconnecting the USB and power cables and 

reconnecting them to the new machine. Power on the unit and immediately remove the 

plastic shipping tray.

a. 

Cycle startup lights follows – Error, Power, In-Use, Error, Power

i. 

If it stays on, there is problem. Try powering down and restarting. If that doesn’t work, 

contact Diagnostics Support.

b. 

The drawer will unlock when the In-Use light goes off. Open the drawer and immediately 

remove the plastic block inside the machine. Keep this on site for the client in the box with  

the backup drivers. I like to write “backup BAX

®

 supplies” on it.

4. 

Power on the computer and launch the BAX

®

 System Q7 software. This will prompt that  

a new machine is connected. Click ok, then import the calibration data.

a. 

Remove the calibration data CD or flash drive from the back of the newly connected BAX

® 

System Q7 and place into the CD drive or USB port.

b. 

Under the Operation tab, select BAX Maintenance, select Import Calibration, click the Browse 

option, locate the CD drive or USB device and open, highlight the calibration file and select 

open.

c. 

Click Import. A prompt will ask if you are sure you want to overwrite the current calibration 

data. Select Ok. This will only take a few seconds and you will see Import Complete when 

finished.

d. 

Under Operation tab, select BAX Maintenance, and update instrument name and serial 

number with current instrument information.

5. 

Using the launched software, run the functional tests for a system check to ensure that the 

machine is in functional order (System Start Up & Check Section, #2, a – c)

6. 

Calibration Check:

a. 

Under the Diagnostics tab, select Calibration, select View Calibration Report. Note date of 

calibration.

b. 

Under the Help tab, select About BAX

®

 System to obtain the current software version.

7. 

Complete the BAX

®

 System Q7 Installation Checklist, save for your records and attach in an 

email to Hygiena at 

[email protected]

Отзывы: