Installation, Programming and Maintenance User Guide Oxymatic Smart
V. 1.3.2. May 2015
13
5.1.1
Fix the control unit and dosing pumps to the wall close to the chamber, near the product
deposits.
5.1.2 Screw titanium and copper
electrodes in order input and
output taking into the guides (
burrs ) on the bottom . Tighten
with hands tightly or with a special
key if necessary
.
.
SINCE LEAVING THE COMB SEPARATOR of the titanium
electrodes to introducing into the chamber.
5.1.3.
Instal the pH, Rx and temperature probes with their probe-carriers, as indicated at the
chamber.
5.1.4.
Instal the flexibles tubes for the dosing pumps ( included)
-
Transparent pipe: extraction of chemical products
-
White pipe: injection of chemical products.
Once all components have been installed in the chamber, open up and close the valves, following the procedure
described in the START-UP section.
WARNING: Do not leave the equipment without water when probes are installed. If pH or Rx probes dry
out, they will be damaged and cannot be used.
PROBES
INJECTORS
White (PE)
Transparent (PVC)