background image

6

Pump
Maintenance

6. After stator retaining ring is 

removed, turn housing upright
and bump on hardwood
blocks. This should jar the 
stator loose and allow it to
drop out.

7. Thoroughly clean housing

before replacing new stator.
Replace stator and make all
wire connections to cord cap
assembly before replacing
housing on pump. This is 
important as leads must be
tucked behind the windings 
by using hands up through 
rotor core.

IMPORTANT: Use only 
compression type insulated 
connectors on the wires. Do not
tape leads as oil will deteriorate
the tape and cause damage to 
stator and bearings.

8. Check top bearing. If clean and

does not turn rough, bearings
can be reused and it is not 
necessary to completely 
dismantle pump to change
bearings. If bearings are 
damaged with dirt or heat, they
must be replaced. See 
additional instructions on 
replacing seals and bearings.
Remember to reinstall the
upper bearing load spring.

9. Replace stator housing onto

seal chamber and bolt in place.

Be sure O-ring seal has been
replaced. If O-ring is nicked or
cut, replace the new rings. This
applies to all O-rings used 
in assembly.

10.After all leads are 

reconnected,  make a high
voltage ground test on each

wire. The only wire that should
show ground is the green
power lead.

11.Refill motor chamber with 

oil.  Use only high grade 
transformer oil or regular
HYDROMATIC

special 

submersible oil. Fill chamber
until oil covers top of 
windings. Leave air space in
top for expansion. Use 
permatex on plug threads.

Replacing Seals And Bearings

1. Drain all oil from motor 

chamber as described.

2. Remove bolts that hold motor

housing to pump housing. 
Remove screws holding seal
plate to motor housing.

3. Lift rotating assembly (rotor,

shaft and impeller) from pump
case and place horizontally on
bench. With hardwood block,
tap end of impeller to loosen
from shaft.

4. Shaft sleeves are not used.

5. Remove lower seal spring and

pry out seal with screwdriver. 

6. Use bearing puller to remove

bearings. Replace with new
bearings. Press only on inner
race of bearing when 
replacing. Pressing on outer
race can damage the bearing.
Bearings are standard size 
that can be obtained from 
any bearing supply house 
or can be obtained from 
HYDROMATIC factory.

7. IMPORTANT: Do not use

any of the old seal parts.
Replace with all new seals.

8. Thoroughly clean all castings

before replacing seals. One
grain of dirt between the seal
faces can cause failure.
Examine all O-rings for nicks
before reusing.

9. Use Locktite  on socket head

locking screw in end of shaft.

10.Before refilling chamber with

oil, air test as described above.

11.Refill chamber with oil as 

described above.

12.Always check all leads with

high voltage or with megger
for grounds before operating
the pump.

CONNECTION DIAGRAM FOR LEADS IN

MOTOR AND CONNECTION BOX

(Y) WYE MOTOR CONNECTIONS

230 VOLTS

460 VOLTS

GREEN

GREEN

L3

L2

L1

L3

L2

L1

3

2

1

9

8

7

6

5

4

3

2

1

9

8

7

6

5

4

Fig. 1

Содержание S4S

Страница 1: ...E To the installer Please make sure you provide this manual to the owner of the pumping equipment or to the responsible party who maintains the system Submersible Sewage Pump S4S Pump Installation and Service Manual ...

Страница 2: ...anel Sump Level Control Sump level is controlled by HYDROMATIC 3900 mercury switch level controls The 3900 level controls is a metal case mercury switch sealed in a solid polyurethane float The float is held in position by a weight attached to the power cord above the float The cord supports the float and is adjusted for height from the surface Typical duplex systems use three Floats the lowest fl...

Страница 3: ... loose with small bar or screw driver in edge of vanes The impeller should turn freely Clean all trash and sticks from sump and connect pump to piping A check valve must be installed on each pump A gate or plug valve in each pump discharge line is also recommended This valve should be installed on the discharge side of the check valve so if necessary to service the check valve the line pressure ca...

Страница 4: ...stallation All wires should be checked for grounds with an ohmmeter or Megger after the connections are made This is important as one grounded wire can cause considerable trouble IMPORTANT If equipment is not properly wired and protected as recommended the motor guarantee is void NUMBER OF CONDUCTORS REQUIRED BETWEEN CONTROL PANEL AND NEMA 4 JUNCTION BOX System Number of Number of Number of Type C...

Страница 5: ...rs it is recommended that a lightning arrestor be installed at the control panel Complete data on lightning arrestors and cost is available from the factory Lightning arrestors are good insurance against damage to an expensive motor Servicing Instructions IMPORTANT Read all instructions before replacing any parts WARNING Before handling these pumps and controls always disconnect the power first Do...

Страница 6: ...TIC special submersible oil Fill chamber until oil covers top of windings Leave air space in top for expansion Use permatex on plug threads Replacing Seals And Bearings 1 Drain all oil from motor chamber as described 2 Remove bolts that hold motor housing to pump housing Remove screws holding seal plate to motor housing 3 Lift rotating assembly rotor shaft and impeller from pump case and place hor...

Страница 7: ...in float control Replace control Pump Troubleshooting Pump runs but will not shut off 1 Pump may be air locked Turn pump off and let set for several minutes then restart 2 Lower float control may be hung up in the closed position Check in sump to be sure control is free 3 Selector switch may be in the Hand position Pump does not deliver proper capacity 1 Discharge gate valve may be partially close...

Страница 8: ...HP 3ø 575V R 1 8 Ref Part Part No No Description Qty 14713 003 1 Stator 71 2HP 3ø 230 460V R 1 14713 203 1 Stator 71 2HP 3ø 200V R 1 14713 603 1 Stator 71 2HP 3ø 575V R 1 27 02577 000 1 Wire Connector As Recq 00282 001 1 Wire Connector 14 16 wire size As Recq 01006 001 1 Wire Connector 10 12 wire size As Recq 28 06461 023 5 Cord Cap Assy 15 Single 10 4 1 06461 024 5 Cord Cap Assy 30 Single 10 4 1 ...

Страница 9: ... 28 24 27 26 25 19 21 20 18 17 29 15 16 4 5 7 8 23 22 9 10 12 13 14 3 2 1 11 6 Not Shown 9 S4S ...

Страница 10: ..._____________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ __________...

Страница 11: ..._____________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ __________...

Страница 12: ...shed to the Buyer shall fail to conform to this contract or to any of the terms of this written warranty Hydromatic Pumps Inc shall replace such nonconforming material at the original point of delivery and shall furnish instruction for its disposition Any transportation charges involved in such disposition shall be for the Buyer s account The Buyer s exclusive and sole remedy on account or in resp...

Отзывы: