Page 15
5.2 Unit Installation Check
Before start-up, pls. check proper unit instal-
lation following the list below:
Unit perpendicularly aligned in both
the vertical and horizontal axis ?
All clearances obeyed?
Steam hose installed with a 5 - 10 %
minimum incline/decline (see chap-
ter "Steam line“) ?
Condensate hose features a loop
functioning as a steam barrier (see
chapter „Condensate hose“) ?
Steam manifold(s) properly positio-
ned?
All bolts and clamps properly tighte-
ned?
Steam manifold(s) horizontally mon-
ted and suspended on the free end,
if required ?
All seals (o-rings) in place?
All ventilation slots on housing top
unobscured?
Содержание FlexLine FLH03
Страница 1: ...FlexLine Electric Heater Steam Humidifiers ÁFLH ENKÈ FLH EN E 8881164 Manual ...
Страница 45: ...Page 45 11 Declaration of Conformity ...
Страница 49: ...Page 49 This page intentionally left blank ...
Страница 50: ...Page 50 This page intentionally left blank ...
Страница 51: ...Page 51 This page intentionally left blank ...