PRE
-
INSTALLATION CONSIDERATIONS
Due to its size, the following determinations must be made before installing a Front Mount Lift:
•
Location of lift assembly (remote or on
-
site)
•
Method of transport from assembly to launch site
•
Equipment required to safely build, transport, and launch the lift
•
Review the bottom of the vessel for strakes, hull steps or protrusions, or thru hull fittings to make sure the
bunks do not come in contact with them.
If you plan to build remotely and assemble the lift before transport, be sure state regulations do not require any
special permits and or escorts for transportation. Consider how to obtain permits and the cost.
Other items to consider:
•
Does the launch site allow commercial work?
•
Do you need a permit to work and/or launch at the ramp or dock?
•
Is there a time limit on dock use?
•
How will you transport the lift from the launch site to the install location?
•
How much of the lift can be preassembled and transported safely?
•
Do you have equipment with the capacity to lift subassemblies onto a trailer for transport to the launch site?
•
Does the final assembly location have equipment to hoist and launch the completed lift?
•
Is there level ground for final assembly, or will some assembly occur in the water?
•
Verify the slip width meets the minimum requirements of the lift width.
•
See
Chart 2
for a list of the required tools.
Working through these considerations is the first step in a successful build.