![HydroHoist Side-Tie 12B Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/hydrohoist/side-tie-12b/side-tie-12b_installation-manual_2192190018.webp)
Assembly
Sec. 3 Pg. 1
Assembly
Sec. 6 Pg. 2
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Tanks, Upper Tank
Bands &Frames
Fig. E
Step
Procedure
1.1
Fig. E
Align the Tanks [1] parallel with each other with the Air Injection Nipple to the front
of the hoist assembly and in the 12 o’clock position. If building a 4 tank lift postion
the 24” Tanks [2] in between the 32” Tanks [1] in their approximate position and with
the nipple at 12 o’clock.
1.2
Refer to Fig. B for correct tank band locations, and position Tank Bands [11A] onto
the tanks [1].
1.3
Place the Frame [12] and the Hinge Base [15] onto Tank Bands [11A] as shown in
Fig. E (do not use Hinge Base [15] on middle frame).
NOTE: Fig. E shows the maximum allowable width of an assembly. Refer to Fig.
A to determine if a narrower width should be used and align the assembly accord-
ingly.
1.4
If building a 3 frame lift Refer to Fig. F and bolt the Walkway Spacer [20] in the out-
ermost holes of the Tank Band [11A] on the middle frame.
1.5
Hand Tighten 1/2” x 6” bolts, nut, and lockwasher in the correct position.
Used: 2F = 12-1/2” x 6” bolts
3F = 20-1/2”x 6” bolts