![HydroHoist Side-Tie 12B Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/hydrohoist/side-tie-12b/side-tie-12b_installation-manual_2192190015.webp)
Getting Started
Sec. 4 Pg. 1
Assembly Platform
Assembly should be done on a flat, level surface.
A flat-bed trailer with 4x4’s across its width is preferred, but a boat trailer with planks across
the frame will work, provided that the assembly surface is flat and level. Be sure to have the
tanks spaced up off of the surface you are building the lift on to allow for the lower tank bands
to be added later.
Tools
A list of tools needed for hoist assembly is given below. In addition to these, tools for boat
dock preparation, dock bumper removal, etc., may also be required.
♦
1/2” Drive Ratchet (minimum 9-inch handle length for leverage)
♦
Electric Drill
♦
3/4” Deep Well Socket
♦
9/16” Deep Well Socket
♦
5/8” Deep Well Socket
♦
15/16” Deep Well Socket
♦
(2) 15/16” Open-end or Combination Wrenches
♦
3/4” Open-end or Combination Wrench
♦
11/16” Open-ended or Combination Wrench
♦
5/16” Nut Runner or medium-blade Slotted Screwdriver
♦
Medium Phillips Screwdriver
♦
Drift Pin or other hole-aligning tool
♦
Large Hammer (3 or 4 lb. shop hammer is best)
♦
Knife or tool for cutting 1” rubber hose
♦
Measuring Tape
Symbols &
Conventions
All references to the LEFT or RIGHT are considered to be facing forward, as if driving a boat
into the slip. Left is Port side, Right is Starboard side.
Parts are occasionally described as LEFT or RIGHT to identify their opposing construction, not
location on the hoist.
All numbers in brackets [ ] after part names refer to the item numbers on the assembly
illustrations within the manual.
Getting Started
End of Section 4
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Содержание Side-Tie 12B
Страница 10: ......
Страница 31: ...T WOT A N KH O I S T S H O S ED I A G R A M F O U RT A N KH O I S T S...
Страница 36: ......