CONNECTING THE CONTROLLER TO COMPLETE LIGHTING FIXTURES
1. Switch the rotary knob on all ballasts to EXT.
2. Insert the RJ9 end of the provided cable into the Zone A (P1) or Zone B (P2) port of the LT1
controller.
3. Insert the RJ14 end of provided cable into the input of an RJ14 splitter (included with XTDEKT1/
XTDEOKT1 light system).
4. Insert one end of an RJ14 cable into one of the splitter outputs, and the other end into the RJ14
port of the first ballast.
5. Use an RJ14 cable (included with XTDEKT1/XTDEOKT1 light system) to connect another output
of the RJ14 splitter to the input of the following splitter.
6. Repeat this process to connect up to 80 ballasts (per zone).
CONNECTING THE CONTROLLER TO REMOTE BALLASTS
1. Switch the rotary knob on all ballasts to EXT.
2. Insert the RJ9 end of the provided cable into the Zone A (P1) or Zone B (P2) port of the LT1
controller.
3. Insert the RJ14 end of the provided cable into one of the two RJ14 ports of the first ballast.
4. Use an RJ14 cable (included with XTDEKT1/XTDEOKT1 light system) to connect the other end of
first ballast to the RJ14 end of second ballast.
5. Repeat this process to connect up to 80 ballasts (per zone).
INSTALLATION
Main Port
Aux Port
Max 80 Ballast
Max 80 Ballast
LT1 DIGITAL LIGHTING CONTROLLER
Main Port
Aux Port
Max 80 Ballast
Max 80 Ballast
LT1 DIGITAL LIGHTING CONTROLLER
7
Содержание Xtrasun LT1
Страница 1: ...XTC1100 USER MANUAL LT1 DIGITAL LIGHTING CONTROLLER ...
Страница 2: ...Hydrofarm com 2 ...