PN-20-09208-00 F © Hydro Systems Company, Inc. 2015 HydroSystemsCo.com Toll Free: 1.800.543.7184 3
STEP 3: Install the wall-mounted transformer
1. Plug the wall transformer into an AC outlet.
2. Plug the barrel adapter into the Taurus CP-300 power connector at the
bottom of pump unit.
The green LED on the pump will turn on, indicating power and the remote
LEDs will flash the firmware revision.
NOTE:
Use only the transformer specified from the manufacturer to
ensure proper operation. Usage of transformer must conform to local
laws and codes.
STEP 4: Prime the pump unit
1. Press and hold the START button on the remote unit for 10 seconds to
start priming.
2. When the tubing is free of air, release the button to stop priming.
Installation
Step 3.1: Plug wall transformer into
AC outlet
Step 3.2: Plug adapter into pump
Step 4.1: Press and hold START
button for 10 seconds
!
WARNING
ADVERTENCIA:
Always verify power source
voltage with volt meter.
Siempre verifique la
alimentación de corriente con
un voltímetro.