
5-15: Machine Maintenance
Re-Installing Manifold
1. Position the outer plungers at the same position (see Figure 5-16).
2.
Re-install manifold and torque the fasteners in an “X” pattern to 50% of specification
and then retorque to 100% specification (see Figure 5-17 and Figure 5-18).
1
3
4
2
5
8
7
6
1
3
4
2
5
8
7
6
Figure 5-16. Re-install Manifold and Torque Fasteners
Figure 5-17. Torque Sequence
in “X” Pattern
Figure 5-18. Torque Bolts to
22 ft. lbs
Содержание Titan 625
Страница 2: ......
Страница 36: ...3 5 Cleaning Information ...
Страница 38: ...3 7 Cleaning Information 16 2 Evolution Flood Wand Item 000 163 058 Only 6 8 lbs ...
Страница 69: ...Water and Chemical System 6 2 ...
Страница 77: ...7 5 Electrical System This page intentionally left blank ...
Страница 84: ...8 7 Systems Troubleshooting 7 Engine Troubleshooting Chart ...
Страница 122: ...9 34 Assemblies and Parts Lists Figure 9 24 Pump Assembly View 1 of 2 610 007 741 Rev C ...
Страница 123: ...9 35 Assemblies and Parts Lists Figure 9 25 Pump Assembly View 2 of 2 610 007 741 Rev C ...
Страница 158: ...Accessories and Chemical Solutions 12 2 ...