4
P/N 211446
07
10/05
HR83003.EPS
211560
Fill hole with concrete. Tamp down concrete
to release air pockets and build drainage hill.
Insert J-bolts (1) from mounting plate (3) into
cement as shown. Move assembly around to
release any air pockets in cement, then rest
mounting plate on cement drainage hill. Apply
some pressure to level mounting plate on top of
drainage hill. Level mounting plate and square
with playing surface. Clean off any excess
cement on mounting plate at this time.
NOTE: Check leveling of mounting plate (3)
several times while concrete is curing.
4.
5.
IMPORTANT!
Front of mounting plate (3)
must be parallel with playing
surface.
DO NOT PROCEED TO STEP 6 UNTIL
CONCRETE HAS CURED FOR A
MINIMUM OF 72 HOURS. ALLOW
ADDITIONAL TIME FOR COLD, WET
OR HUMID WEATHER.
WARNING
HR83004.EPS
211560
PLAYING SURFACE
HR83005.EPS
211560
3