13
Now mount the nose part. Clean all threads with Loctite 7063, and add Loctite 243 to all
threads. Tighten screws with a torque of 25 Nm. Mount the lock ring on the chisel
retainer. Grease the thread of the nose part with copper paste, and mount the chisel
retainer. Mount tail-hoses. Mount the pressure hose with female coupling at ”P”, and
mount the return hose with male coupling at ”T”.