LGK-100.160.200IGBT OPERATOR’S MANUAL
13
1. Transport and Lift
A. Power source should be shut off before moving the cutter.
B. The cutter bottom should be kept downwards during transportation. It is forbidden to have
cutter placed transversely or upended.
C. When lifting, it must be lifted vertically.
D. During the long-distance transportation, it must prevent the cutter from raining and
moving back and forth inside box. Shock absorption foam should be placed around cutter.
2.
Installation and Connection
A.
Power source should be shut off before installation and connection.
B.
Installation environment details refers to the point “Work Environment Requirements”.
C.
If cutting power source is placed in a slanted surface, it must be prevented from falling
down.
D.
Shield rank for cutting power is IP21S. The installation and operation cannot be
proceeded in the rain.
3.
Power supply requirements
A.
Voltage fluctuation
≤
±10
%;
B.
Frequency fluctuation
≤
±1
%;
C.
Asymmetry rate of three-phase supply system
≤
5
%;
D.
Power supply wire cross profile, ground wire cross profile, breaker and fuse should
refer to the diagram below.
Items LGK-100
LGK-160
LGK-200
Power supply wire cross profile
(
mm
2
)
≥
6
≥
10
≥
16
Ground wire cross profile
(
mm
2
)
≥
6
≥
10
≥
16
Breaker capacity
(
A
)
80A
100A
160A
Fuse capacity
(
A
)
45
60
90
4.
Installation of power wire
Shut off the power switch first. Connect the power input wire of cutter back panel to distribution
box which meets the parameters in the diagram above.
5.
Connection of ground wire
Connect the green-yellow wire of power source line, which cross profile must match the
requirements in above form, to ground firmly. Earth connecting method should follow state
standard.