Poseidon 3268 – starting guide
HW group
Oficjalny dystrybutor:
www.atel.com.pl
45-231 Opole
tel. +48 (77) 455 60 76
ATEL ELECTRONICS
e-mail: [email protected]
ul. Oleska 121
fax. +48 (77) 455 80 56
Starting Guide – Poseidon 3268
First steps for I/O & temperature control with Poseidon
1) Connecting the Poseidon 3268
•
Green POWER LED on the RJ45 socket lights up – power supply is OK
•
Yellow LED on the RJ45 socket flashes – connection to 10 Mbit network is OK
Accessories
600 239
Gas Leak Detector
Flammable gas detector, 12V, Dry Contact output
600 240
Flood detector
Water level detector, Dry Contact output
600 005
Temp-1Wire 3m
Temperature sensor, 3m cable (1m = 600 242 , 10m = 600 056)
Poseidon 3268
1.5) Temperature or humidity sensors (IT bus interface)
(Temp-1Wire or Humid-1Wire), RJ12 jack must click in.
1.3) Connect the power adapter to an outlet (230 / 110V)
and to the Poseidon 12V power supply connector.
1.6) Connect Poseidon to the Ethernet (patch cable to switch, or cross-over cable to PC)
1.2) Output (double-throw relay contact) to turn on/off
external devices (fans, A/C, heating, horn, etc.)
1.1) Check the DIP switches. For installation, set them as shown
in the picture (DIP1=Off, DIP2=Off).
1.4) Dry contact inputs to connect sensors with Dry
Contact outputs (buttons, relay contacts, door contacts).
NO NC
Output On
NO NC
Output Off
Input On Input Off
Output 1
Poseidon 3268