PRODUCT INSTALLATION MANUAL
DO13 SELF SERVE OLIVE
_________________________________________________________________________________________________________________________
Page 1
Hussmann
Contents
Pre-installation
2
Important Safety Instructions
2
Case services dimensions
3
Operating environment
4
Handling and transporting cases
4
Shipping damages and shortages
4
Installation
5
Positioning and levelling
5
Sealing case joins
8
Joining the cases
9
Attaching kick plates
10
Connecting refrigerant lines
12
Installing the waste drain
13
Connecting power supply
14
Installing sensor probes
15
Mounting fixtures
16
Commissioning
17
Cleaning case
17
Starting up
17
Start-up checks
17
Decommissioning
17
Disposal
17
Operation
18
Loading Merchandise
18
Cleaning and Maintenance
18
Daily Checks
18
Cleaning
19
Important Notes
19
Cleaning Procedure
19
Six Monthly Maintenance
20
Operation Servicing
20
Troubleshooting
21
Controller troubleshooting
22
Appendixes
23
Appendix 1
Wiring diagrams
23
Appendix 2
Produce Engineering Datasheets
23
Appendix 3
Setting table
23
Appendix 4
Attaching case ends
23
Appendix 5
Risk analysis
25
Appendix 6
Electronic Expansion Valve Specification
26
Appendix 7
Controller
26
Appendix 8
Warranty
27