17 ENGINE
Preparatory work
-
Check the transmission. (,.... p. 166)
-
Carefully lubricate all parts before assembling.
Main work
-
Secure the main shaft with the toothed end facing downward in the vise.
Guideline
Use soft jaws
-
Mount needle bearing
O.
-
Mount fifth-gear idler gear@.
-
Mount stop disk
(D
and lock ring
8.
-
Mount third-gear sliding gear
0.
-
Mount lock ring
(D
and stop disk @.
-
Mount needle bearing
@).
-
Mount fourth-gear idler gear
0.
-
Mount second-gear fixed gear Gi) and stop disk
48.
-
Finally, check all gear wheels for smooth operation.
17.4.41 Assembling the countershaft
•
Info
I
Use new lock rings with every repair.
Preparatory work
-
Check the transmission. (,.... p. 166)
-
Carefully lubricate all parts before assembling.
168
306557-10
Содержание FC 350 2014
Страница 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2014 FC 350 EU Art no 3403006en Husqvarna MOTORCYCLES ...
Страница 2: ......
Страница 90: ...12 FUEL TANK SEAT TRIM Start the motor and check the response 88 ...
Страница 192: ...18 CLUTCH 190 Position the cover with the membrane Mount and tighten the screws ...
Страница 236: ...30 SPECIAL TOOLS 234 Nitro en filling tool Art no T170S1 2x 3x T170S1 H00855 01 ...