background image

47952.doc

09/11/2006

 

Note 1-Detent Pin Removal

Note #2-Position Handle So Cam Latch will

be pointing up when handle is horizontal.

Note #1-Removing Detent Pin

Cam Latch

Detent Pin

Note #3- 3/8 X 3_”

Bolt through

Channel Iron with

Nut Plate attached.

Note #4-4” Strap shown positioned under

end of Channel Iron. 8” Strap used under

box  rail in Suburban only

4” Strap

Retention

Block

Note 5-Retention Block shown installed. Take

care to center liner before installing block.

8” Strap

 

 

Note #6 – Remove Hinge Stop Lever to

allow placement of Storage Box

Note 7-4” Extrusion Plate shown installed.

Note 8-Positioning of Nut Plate

Nut

Plate

Отзывы: