2
OPERATIONAL MAINTENANCE
2.1
Routine Checks
These procedures should be carried out each time the system is used.
1. Inspect the pump unit for external damage to case, controls, and
connections.
2. Inspect power cord for damage or twisting, and replace if necessary.
3. Check that the control knob is set to the recommended setting of
40 mmHg.
4. Check the calibration of the control knob and pressure display. In
normal operation, when the display reads 40, the knob pointer should
be somewhere within the 40 arc. If not, the pump should be returned
to Service for recalibration.
5. Check the hanging hook is secure.
6. Check the feet are in place.
247901
2-1
Issue 1
March 1998
Содержание Flowtron AC550
Страница 1: ...247901 Issue 1 Mar 1998 AC550 Flowtron Excel system Service Manual Huntleigh HEALTHCARE...
Страница 2: ...247901 Issue 1 Mar 1998...
Страница 4: ...247901 ii Issue 1 March 1998...
Страница 6: ...247901 iv Issue 1 March 1998...
Страница 12: ...1 4 Pneumatic Schematic 247901 1 4 Issue 1 March 1998...
Страница 13: ...1 5 Valve Sequence 247901 1 5 Issue 1 March 1998...
Страница 14: ...1 6 Electrical Wiring Schematic 247901 1 6 Issue 1 March 1998...
Страница 15: ...1 7 General Assembly 247901 1 7 Issue 1 March 1998...
Страница 16: ...247901 1 8 Issue 1 March 1998...
Страница 18: ...247901 2 2 Issue 1 March 1998...
Страница 30: ...247901 4 8 Issue 1 March 1998...
Страница 32: ...5 4 Replacing Main PCB or Front Display Panel 247901 5 2 Issue 1 March 1998...
Страница 33: ...5 5 Replacing the Motor Gearbox Assembly 247071 247901 5 3 Issue 1 March 1998...
Страница 35: ...5 10 Pressure Control Assembly 247901 5 5 Issue 1 March 1998...
Страница 38: ...247901 5 8 Issue 1 March 1998...
Страница 40: ...247901 6 2 Issue 1 March 1998...