13
3.
Route the orange air line
(Fig. 31)
through the upper rear port without grommet
(Fig. 32)
.
Fig. 31 Fig. 32
4.
Position the side panel and secure with hardware previously removed
(Fig. 33)
.
Fig. 33
5.
Air tank installation is now complete. Proceed to "Install Side Storage Shelf" on page 21.