
controllers be mounted 15' (4.5 m) away from pumps and high-voltage devices.
1. Detach the pump start relay cover plate by removing the four screws with
Phillips screwdriver.
2. Run a single wire from the "common" terminal on the controller to one of the yellow
wires on the pump start relay.
3. Run a single wire from the "P/MV" terminal on the controller to the other yellow wire on
the pump start relay.
4. Use wire nuts to make the connections and verify they are secure.
5. Install pump start relay cover plate and four screws. Close and lock the cabinet door.
6. Route wire through the conduit or one of the openings on the bottom of the cabinet.
7. Strip ½" (13 mm) of insulation from the ends of all wires. Secure the valve common
wire to “
COM
” (Common) terminal. Attach the opposite control wire to the M/V terminal.
Pump Start Relay Maximum Wire Lengths
MAXIMUM one-way wire length (do not go this far!)
Model
18 AWG
16 AWG
14 AWG
12 AWG
10 AWG
8 AWG
PSR-22
243 ft
386 ft
616 ft
976 ft
1,551 ft
2,463 ft
PSR-52
134 ft
214 ft
341 ft
540 ft
859 ft
1,365 ft
PSR-53
134 ft
214 ft
341 ft
540 ft
859 ft
1,365 ft
HC
PRO-HC
HPC
HCC
Copyright 2020 Hunter Industries. All Rights Reserved.
72
Содержание Hydrawise Ready
Страница 1: ......
Страница 50: ...CONTROLLER SCREENSHOTS Copyright 2020 Hunter Industries All Rights Reserved 50 ...
Страница 58: ...Step 2 Step 3 Copyright 2020 Hunter Industries All Rights Reserved 58 ...
Страница 59: ...Step 4 Copyright 2020 Hunter Industries All Rights Reserved 59 ...
Страница 82: ...Copyright 2020 Hunter Industries All Rights Reserved 82 ...