Hunter 45DS • Documents and Forms
2.4
Preliminary care and maintenance checklist
A qualified Technician should be used if you are not completely confident in your ability to
make repairs or inspections.
Out of Water Inspection
Pre-launch inspection
____ Sacrifi cial zinc anodes installed
____ Propeller installed with keyway, nuts and cotter pin
____ Propeller shaft turns freely and without excess wobble
____ Struts and shaft log free of corrosion
____ Rudder swings easily & correct with wheel direction
____ Rudder and post inspected for cracks and/or concealed damage (may require removing rudder)
____ Auxiliary tiller handle properly aligned, fi ts securely and operational
____ All thru-hulls and valves below water line inspected for corrosion, labeled and closed until after launch
____ Bottom paint in satisfactory condition
____ Hull freshly cleaned and waxed (free of gelcoat damage)
____ Mooring, safety lines and fenders onboard and in good condition
____ House & engine start batteries installed and fi lled with correct electrolyte levels
____ House & engine start battery boxes secured
____ All battery terminals clean and wires secured
____ Engine block & transmission drains closed
____Speed / Depth transducers in place. Speed paddle wheel rotates smoothly
____ Hose clamps on all systems below water line tight
____ Keel bolts tight and clean
____ Exhaust hose attached and secured
____ Boat is free of internal and external water leaks above water line
(Failure to stop water intrusion could result in permanent damage or deterioration of structural coring materials, internal wiring and cause mildew and molding)
Mast Assembly
____ Review manufacturers manual for maintenance and up-keep
____ Spreaders securely fastened
____ Mast and spreaders free of corrosion and stress cracks
____ Standing rigging and pins inspected for wear, tear, corrosion and cracking
____ External wiring secured for anchor, steaming and deck lights
____ Electronic wind indicator installed per manufacturers recommendation
____ Manual wind indicator installed on masthead
____ VHF antenna installed and connected
____ Headsail furling system installed inspected per manufacturers recommendation
____ Running rigging inspected for wear and tear
____ Mast step stand-up blocks secured and operational
____ Main Sail, jib sail and fl aking system inspected for wear and tear (non-furling mast).
____ In- mast system checked for smooth operation and overall condition of sails
____ Specifi ed pre-bend and diagonal tensions attained in mast. See owners manual
____ Mast to deck wiring properly sealed with drip loop
Содержание H45DS
Страница 1: ...Operator s Operator s Manual Manual V1 071507 P N 1033462 H H45 45DS DS ...
Страница 2: ......
Страница 9: ...Introduction Introduction Chapter 1 Chapter 1 H H45 45DS DS ...
Страница 14: ...Hunter 45DS Introduction 1 6 Notes ...
Страница 15: ...and Documents Documents Forms Forms H H45 45DS DS Chapter 2 Chapter 2 ...
Страница 26: ...Hunter 45DS Documents and Forms Maintenance Log Date Maintenance Performed Hourmeter 2 12 ...
Страница 27: ...Hunter 45DS Documents and Forms 2 13 Date Maintenance Performed Hourmeter Maintenance Log ...
Страница 30: ...Hunter 45DS Documents and Forms Power Squadron recommendations for maintenance and safe boating 2 16 ...
Страница 33: ...Hunter 45DS Documents and Forms 2 19 Spare Parts List ...
Страница 34: ...Hunter 45DS Documents and Forms Dates of practice drills and onboard safety inspections 2 20 ...
Страница 35: ...Hunter 45DS Documents and Forms 2 21 My personal preferences for maintenance items safety gear ...
Страница 36: ...Hunter 45DS Documents and Forms Notes 2 22 ...
Страница 37: ...H H45 45DS DS Warranty Warranty Chapter 3 Chapter 3 ...
Страница 38: ...This Page Intentionally Left Blank Hunter 45DS Warranty 3 2 ...
Страница 45: ...Boating Boating Safety Safety Chapter 4 Chapter 4 H H45 45DS DS ...
Страница 62: ...Hunter 45DS Boating Safety 4 18 This Page Intentionally Left Blank ...
Страница 66: ...Hunter 45DS Boating Safety 4 22 This Page Intentionally Left Blank ...
Страница 67: ...Fuel Fuel Systems Systems Chapter 5 Chapter 5 H H45 45DS DS ...
Страница 73: ...Fig 5 7 A Quick Fuel Filter Reference Hunter 45DS Fuel Systems 5 7 ...
Страница 78: ...Notes Hunter 45DS Fuel Systems 5 12 ...
Страница 80: ...This Page Intentionally Left Blank Hunter 45DS Fuel Systems 5 14 ...
Страница 82: ...This Page Intentionally Left Blank Hunter 45DS Fuel Systems 5 16 ...
Страница 83: ...Underwater Underwater Gear Gear Chapter 6 Chapter 6 H H45 45DS DS ...
Страница 92: ...Hunter 45DS Underwater Gear 6 10 This Page Intentionally Left Blank ...
Страница 94: ...Hunter 45DS Underwater Gear 6 12 This Page Intentionally Left Blank ...
Страница 95: ...DC Electric DC Electric Systems Systems Chapter 7 Chapter 7 H H45 45DS DS ...
Страница 106: ...NAV LIGHTS DECK LIGHTS Hunter 45DS DC Electric 7 12 ...
Страница 108: ...This Page Intentionally Left Blank Hunter 45DS DC Electric 7 14 ...
Страница 110: ...This Page Intentionally Left Blank Hunter 45DS DC Electric 7 16 ...
Страница 111: ...AC Electric AC Electric Systems Systems Chapter 8 Chapter 8 H H45 45DS DS ...
Страница 118: ...Hunter 45DS AC Electric 8 8 Notes ...
Страница 120: ...Hunter 45DS AC Electric 8 10 Notes ...
Страница 121: ...Water Water Systems Systems Chapter 9 Chapter 9 H H45 45DS DS ...
Страница 130: ...Hunter 45DS Water Systems 9 10 Notes ...
Страница 134: ...This Page Intentionally Left Blank Hunter 45DS Water Systems 9 14 ...
Страница 135: ...Waste Waste Systems Systems Chapter 10 Chapter 10 H H45 45DS DS ...
Страница 148: ...Notes Hunter 45DS Waste and Sanitation Systems 10 14 ...
Страница 149: ...and Engines Engines Transmissions Transmissions Chapter 11 Chapter 11 H H45 45DS DS ...
Страница 158: ...Hunter 45DS Engines and Transmissions 11 10 This Page Intentionally Left Blank ...
Страница 159: ...and Sails Sails Rigging Rigging Chapter 12 Chapter 12 H H45 45DS DS ...
Страница 161: ...Hunter 45DS Sails and Rigging 12 3 Fig 12 1 Mainsheet Purchase Traveler optional B R Rigging Jib Boom Mast Winches ...
Страница 162: ...Hunter 45DS Sails and Rigging 12 4 H A B C D E F G C A B D E F G H J K I Upper Spreader Tip Lower Spreader Tip Fig 12 2 ...
Страница 174: ...Hunter 45DS Sails and Rigging 12 16 Jib Furling Line Layout ...
Страница 175: ...Hunter 45DS Sails and Rigging 12 17 Mainsheet Traveller ...
Страница 176: ...Hunter 45DS Sails and Rigging 12 18 Arch Install ...
Страница 177: ...Hunter 45DS Sails and Rigging 12 19 Arch Install Continued ...
Страница 180: ...Hunter 45DS Sails and Rigging 12 22 Lazy Jack Installation ...
Страница 181: ...Hunter 45DS Sails and Rigging 12 23 Lazy Jack Installation Continued L J k I t ll ti C ti d ...
Страница 182: ...Hunter 45DS Sails and Rigging 12 24 Notes ...
Страница 183: ...Getting Getting Underway Underway Chapter 13 Chapter 13 H H45 45DS DS ...
Страница 190: ...Hunter 45DS Getting Underway 13 8 Notes ...
Страница 191: ...Maintenance Chapter 14 Chapter 14 H H45 45DS DS ...
Страница 203: ...Glossary Glossary Chapter 15 Chapter 15 H H45 45DS DS ...
Страница 209: ...Notes Hunter 45DS Glossary 15 7 ...
Страница 210: ...Notes Hunter 45DS Glossary 15 8 ...