8
42891-01 • 11/19/10 • Hunter Fan Company
3 • Assembling Pipe / Ball Assembly
8
Figure 3b
Figure 3a
2 1/2” Pipe / Ball
Assembly
4 1/2” Pipe
2 1/2” Pipe
Positioning
Screw
Pin
As discussed in " Step1 - Getting Ready", your Hunter fan can be
installed in either the standard or angled mounting positions.
Included with the fan are two pipes: one 4 1/2" long pipe/ball
and one 2 1/2" long pipe. See Figure 3a.
If you are going to install the fan using the 2 1/2” long pipe, go to
"Step 4 - Assembling the Fan".
Removing Ball Assembly
For the following steps refer to Figures 3b and 3c.
3-1. Locate the 2 1/2" pipe/ball assembly.
3-2. Remove the positioning screw from the top of the ball.
Note:
The ball will become loose and should slide down the pipe.
3-3. Remove the ball from the pipe.
3-4. Remove the pin from the pipe.
3-5. Carefully loosen and remove the ground screw/leadwire assembly
from the pipe.
3-6. Locate the 4 1/2" pipe.
3-7. Insert and tighten the ground screw/leadwire assembly into the
small screw hole on one end of the 4 1/2" pipe.
3-8. Insert the pin into the two holes in the 4 1/2" pipe so that the pin
is placed evenly in the hole.
3-9. Insert the threaded end of the pipe into the flat side of the ball.
3-10. Align the cutouts in the ball with the pin and the ground screw
assembly.
3-11. Slide the ball up the pipe until it hits the pin.
3-12. Insert and tighten the positioning screw into the ball so that the
head of the screw is placed on the end of the pipe.
Note:
Make sure that the ball is positioned so that it is level or
straight.
Figure 3c
Ball
Ground
Screw
Leadwire
Assembly
CAUTION
• Make sure that the leadwire asembly is
pointing straight up and away from the pipe
• To avoid possible electrical shock, the
ground screw must be tightened securely.
• Failure to complete the steps above
properly could result in the fan falling.
• Do not overtighten the postioning screw
as it may cause the ball to seat improperly,
resulting in fan wobble andthe fan haing
crokedly
4 1/2”
Pipe / Ball
Assembly
Assembling the Fan for Ceilings 9 Feet or Higher
3 • Assembling Pipe / Ball Assembly
8