Att
Follo
N
th
1.
2.
3.
4.
5.
6.
7.
Assemble the Control Head Base
Your control head base will have a tilt mount. See the instructions below to
assemble and mount the control head base.
1.
Set the tilt mount control head base in
place on the mounting surface.
2.
Mark the four mounting screw
locations with a pencil or punch.
3.
Set the base aside, and drill the four
mounting screw holes using a 9/64"
bit.
4.
Proceed to
Route the Control Head
Cables Under the Deck
.
Route the Control Head Cables Under the Deck
Use the following steps to route the control head cables under the deck.
NOTE:
Under the deck cable routing is not always possible. If this is not an option,
the cables should be routed and secured above deck.
1a. Mark and drill a 3/4" hole as shown in Figure 5. Route the cables
through the hole. The cables will exit through the center hole on the
control head base.
1b. If the cables cannot be routed directly beneath the control head base,
mark and drill a 3/4" hole that will allow you to run the cables close to
the control head base.
NOTE:
See the installation section for your transducer type in order to plan the
location of the transducer and cable route.
3/4”
19 mm
Figure 5
Tilt Mount Control Head Base
4
Fixed Control Head Installation
PiranhaMAX_Manual_532273-1EN_A.qxp:Layout 1 4/18/14 11:34 AM Page 4