IMPULSE SEALING EQUIPMENT 

 

To  ensure  that  satisfactory  sealing  performance  is  achieved  and  that 
service  life  of  consumable  spares  (such  as  element  wire,  Teflon  and 
rubber pressure pads) are maximised, it is necessary to understand the 
operating principles of this type of equipment. 
 

1. 

To adjust the heat setting for a particular thickness of material, the 
power output is not varied, and varying the length of time that the 
current passed through the element resistance wire effects adjustment.  
The timer control allows infinitely variable time adjustment up to a 
maximum of around 3 ½ seconds. 

 
 

2. 

When the red heating indicator light goes out the temperature has 
reached its maximum and the polythene is molten to effect the weld.  It 
is important that before allowing the jaws to open for removal of the 
polythene a short cooling time is allowed to enable the polythene to 
solidify and to regain its original strength.  On machines fitted with a 
dual timer control, the cooling time can be pre-set but on standard 
machines with simple heating time control, the operator should allow 
sufficient time for cooling before releasing the jaws.  Depending on 
material thickness a cooling time of 1 to 7 seconds is usually sufficient. 

 

3. 

To complete the seal in the minimum possible time considerable power 
is applied to the element for the short duration of the welding cycle.  
The instantaneous temperature reached during the brief cycle is very 
high, but close contact of the spring loaded rubber pressure pad 
removes excess temperature and prevents deterioration of the thin 
Teflon barrier tape. 

 
 

4. 

It follows that if the pressure bar is released before the temperature 
reduces to a level that the Teflon can withstand, it will deteriorate 
rapidly and require premature replacement.  

 
 

5. 

For this reason adequate cooling allowance is critical to the service life 
of the Teflon.  Although capable of withstanding up to 20,000 seals 
before replacement, insufficient cooling time can cause burning within a 
very short period.   

 
 

 
 
 
 

Содержание HM2500

Страница 1: ...HM Operating Instructions HM2500 HULME MARTIN HEAT SEALERS HULME MARTIN HEAT SEALERS www hulmemartin co uk...

Страница 2: ......

Страница 3: ...urrent device RCD is used in the supply circuit to the heat sealer This applies particularly in damp conditions but the equipment must not be allowed to get wet either from sealing liquids cleaning or...

Страница 4: ...before attempting to reach between the jaws On hand operated machines which are pivoted at one end of the pressure bar the knife will slide towards the pivot point when the pressure bar is lifted For...

Страница 5: ...nal strength On machines fitted with a dual timer control the cooling time can be pre set but on standard machines with simple heating time control the operator should allow sufficient time for coolin...

Страница 6: ...microswitch is set to avoid application of power to the element until the rubber pad is fully aligned and pressed closely to the Teflon to allow the necessary heat transfer The rubber pressure pad is...

Страница 7: ...0 impulse sealer is fitted with a single electronic timer controlling the heating cycle When sufficient pressure is applied to the pressure bar the audible click of the microswitch and the illuminatio...

Страница 8: ...s the wire to be inspected and replaced if kinked or damaged When rewiring the element ensure that the wire passes over the pins down through the hole at each end of the bar and up through the contact...

Страница 9: ...ber Pressure Pad each 250204 Underwire Insulating tape pkt 5 250206 Resistance wire strips pkt 5 When ordering spares please quote the serial number of the machine as etched on the plate at the rear o...

Страница 10: ...ng Directive Directive 2004 12 EC 94 62 EC Whilst we are not required to register under this directive we use minimal packaging to ensure your purchase reaches you in a first class condition Packaging...

Страница 11: ...of charge within the 12 month warranty period provided that the machine has not been misused is correctly maintained and has not been subject to unauthorised repair Consumable spares items such as th...

Отзывы: