
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
• www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4585-MD4-01-en-000.doc
- 28 -
15 Hand over document
After the installation of the equipment pass the installation and
maintenance documents to the operator. The operator has to receive the
hand over documents. The complete filled and signed hand over
document should be sent to the supplier.
Art.-No.: 4585-MD4
Type of item: Cyclops Swinger
Serial number: _________________________________________________
Customer or operator (Local Authority, Town Council, School, etc.):
_____________________________________________________________
_____________________________________________________________
Competent person in charge:
_____________________________________________________________
_____________________________________________________________
Installation Company (address):
_____________________________________________________________
_____________________________________________________________
Responsible assistant (assembler):
_____________________________________________________________
_____________________________________________________________
Received the complete assembly instructions, maintenance instructions and
maintenance printout.
_____________________________________________________________
(Signature of operator)
(Signature of Installation Company)
(Stamp)
Date: ___________________