Huck 4585-MD4 Скачать руководство пользователя страница 6

 

 

 

 

\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4585-MD4-01-en-000.doc

 

 

2  Datasheet: Cyclops Rope-End Swinger 

1. 

Space requirement: 8.0m x 3,0m including safety zone, height of fall 1.50m  

The Images (individual drawings) are not to scale !!

 

2. 

Required safety surface: 

Surface material 
 

Description 
mm 

Minimum 
thickness of 
layer 

 mm 

Maximum  
height of fall 

 mm 

Topsoil grass  

 

 

<= 1000* 

Chipped bark 

20 – 80 grain size 

300/400 

<= 2000/3000 

Wood chippings 

5 – 30 grain size 

300/400 

<= 2000/3000 

Sand 

0.2 – 2 grain size 

300/400 

<= 2000/3000 

Gravel 

2 – 8 grain size 

300/400 

<= 2000/3000 

Other ground 
materials 

As recommended by 
manufacturer 

 

 

 

3. 

Name and overall dimension of the largest component: 
Steel post (1 piece) length 4,0m, ø 102 mm 

4. 

Name and weight of the heaviest component: 
Steel post ( piece), approx. 26 kg 

5. 

Intended age group: 4 years and over 

6. 

Please note that this equipment is set in concrete.

 

Concrete: C25/30 
Required concrete: 0.86 m

3

 

Foundations/area to be excavated: 

6 x

 0.60 m long x 0.60 m wide, total depth 1.10 m including .10 cm drainage 

and .40cm Surface material. 
 

   

Round off foundation edges (min.R = 100 mm)! Sizes of fundations are “4-5” 
(natural ground).

 

 
Soil class 4: soft to medium plasticity, interleave bound, with minor portion of 
stone (portion < 30% with bigger diameter of 63 mm grain size). 

 
Soil class 5 : ground with soil class 3 and 4 with big portion of stones  
(portion > 30% with bigger diameter of 63 mm grain size). 

 
In case of sandy and soft soils, the surface measure of foundations have to be 
enlarged for about 50%!

 

Содержание 4585-MD4

Страница 1: ...tion Instructions 2012 2013 4585 MD4 01 en 000 doc 1 A Assembly Instructions Cyclops Rope End Swinger Mini 4 Seater Single Art 4585 MD4 Operator _____________________________________________________ L...

Страница 2: ...stallation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc Revision history Revision 0 2010 09 02 The first allowed version Assembly instructions JF All rights reserved Copyrig...

Страница 3: ...11 5 Post installation checks 19 B Maintenance instructions 17 6 Introduction Maintenance 19 7 General maintenance information 20 8 Maintenance timetable 22 9 Regular maintenance 23 10 Monthly mainten...

Страница 4: ...ined directly from your supplier Please do not hesitate to call your supplier if you have any problems during installation or in case of any other questions Following installation complete assembly in...

Страница 5: ...erve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the prope...

Страница 6: ...dimension of the largest component Steel post 1 piece length 4 0m 102 mm 4 Name and weight of the heaviest component Steel post piece approx 26 kg 5 Intended age group 4 years and over 6 Please note...

Страница 7: ...oc 7 7 Assembly time once foundations completed 4 hours Required assistants 2 3 persons 8 Any spare parts which may be required can be obtained directly from your supplier 9 We hereby confirm that thi...

Страница 8: ...contents in words Pos Quantity Element Description Size O K Missing 1 2 Steel Pipe 102 mmx 4 00 m 2 4 Corner Pipe Connectors 114 mm 3 4 Steel Pipe 102 mmx 3 50 m 4 10 Tube Clamps with Carriage Bolts F...

Страница 9: ...text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 9 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 2 2 4 3 4 4 10 5 1 6...

Страница 10: ...lation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc Pos Quantity Symbol 9 16 10 2 11 4 Loctite Thread locking Adhesive Glue all screws nuts and sleeves with loctite not less...

Страница 11: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 11 4 Erection Instructions...

Страница 12: ...12 Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc...

Страница 13: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 13...

Страница 14: ...14 Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc...

Страница 15: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 15...

Страница 16: ...16 Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc...

Страница 17: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 17...

Страница 18: ...ection O K Upper edge of playing level PS Safety area SSR Install nuts on the bottom side Round off foundation edges min R 100 mm Sizes of fundations are designed for soils class 4 5 natural ground So...

Страница 19: ...lation of equipment is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal of all assembly aids Please make sure...

Страница 20: ......

Страница 21: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 17 B Maintenance Instructions Cyclops Rope End Swinger Mini 4 Seater Single Art 4585 MD4...

Страница 22: ...stallation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc Revision history Revision 0 2010 09 02 The first allowed version Maiantanance instructions All rights reserved Copyri...

Страница 23: ...oviding any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained...

Страница 24: ...less steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare...

Страница 25: ...at there are no missing screws 7 11 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 7 12 Claims lia...

Страница 26: ...vals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 Faults that compromise safety In t...

Страница 27: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4585 MD4 01 en 000 doc 23 9 Regular maintenance...

Страница 28: ...ssary remove excess padding material from the post footings due to danger of rotting 10 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or...

Страница 29: ...In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and...

Страница 30: ...____________ Location ________________________________________________________________________________________ Customer or operator ____________________________________________________________________...

Страница 31: ......

Страница 32: ...c _____________________________________________________________ _____________________________________________________________ Competent person in charge _______________________________________________...

Отзывы: