Huck Sei
ltechnik GmbH • 35614 Aßlar/Berghausen • Germany
• www.huck.net
- 18 -
\\CAD1\Standard\4959-20\Montageanleitungen\Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR.doc
8.10 Faults
Demeges must be repaired as soon as they are detected. If serious
defects that affect the safetyness cannot be repaired straight away, the
playground item must be blocked with immediate effect.
8.11 Loose screws
Loose screws always cause quality problems and put safety at risk.
Therefore, loose screws should always be tightened and checks carried
out to ensure that there are no missing screws.
8.12 Preventing equipment use
The use of the equipment should be prevented in case of incomplete installa-
tion, disassembly, maintenance, repairs and faults.
8.13 Safeguarding the guarantee
Steel posts and footings are covered by our guarantee if regular maintenance
is carried out and recorded in writing.
Our general terms and conditions apply. Maintenance of steel poles first takes
place after 3 years. The steel posts must be excavated down to the concrete
foundations and checked for corrosion.
Zinc paint should be applied to any corroded areas and scratches.
Check ropes for abrassion, replace ropes where coating is damaged down to
the steel inlet.
Содержание 4959-20
Страница 24: ......