8.10  Faults 

 

Demeges must be repaired as soon as they are detected. If serious     
defects that affect the safetyness cannot be repaired straight away, the 
playground item must be blocked with immediate effect. 

 

8.11  Loose screws 

 

Loose screws always cause quality problems and put safety at risk. 
Therefore, loose screws should always be tightened and checks carried 
out to ensure that there are no missing screws. 

 

8.12  Preventing equipment use 

The use of the equipment should be prevented in case of incomplete installa-
tion, disassembly, maintenance, repairs and faults. 

 

8.13  Safeguarding the guarantee 

Steel posts and footings are covered by our guarantee if regular maintenance 
is carried out and recorded in writing. 

 

Our general terms and conditions apply. Maintenance of steel poles first takes 
place after 3 years. The steel posts must be excavated down to the concrete 
foundations and checked for corrosion.  

 

Zinc paint should be applied to any corroded areas and scratches. 
 

Check ropes for abrassion, replace ropes where coating is damaged down to 
the steel inlet. 

 

 

 

 

 

 

 

 

 

Содержание 4959-20

Страница 1: ...enture Bridge with wooden rungs Art No 4959 20 Operator _____________________________________________________ Location ______________________________________________________ Attention The distance bet...

Страница 2: ...Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc Revision history Revision 1 2004 04 28 The first released version Assembly instructions Revision 8 2020 06 17...

Страница 3: ...y contents parts list with part numbers 8 4 Abk rzungen 10 5 Erection instructions 11 6 Post installation checks 14 B Maintenance instructions Adventure Bridge with wooden rungs Art No 4959 20 15 7 In...

Страница 4: ...btained directly from your supplier or from Fa Huck Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 A lar Berghausen Tel 49 6443 83 11 99 Fax 49 6443 83 11 79 Please do not hesitate...

Страница 5: ...l views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measurem...

Страница 6: ...000 400 3000 Other floor materi als As per HIC audited Critical drop height as tested Sand and gravel must be well rounded to remove most of the silty or clayey particles Washed sand or gravel is cons...

Страница 7: ...g portion of stones portion 30 with bigger diameter of 63 mm grain size In case of sandy and soft soils the surface measure of foundations have to be enlarged for about 50 8 assembly time approx 1 hou...

Страница 8: ...contents parts list with part numbers 3 1 In words Table 3 1 Delivery contents in words Pos Quantity Element Description Size O K Missing 01 4 Steel post 102 mm lg 2400 mm 02 4 Red cover cap 102 mm 03...

Страница 9: ...uck net CAD1 Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc 9 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 01 4 102 mm lg 2400...

Страница 10: ...4 Abk rzungen AB The legally prescribed setting times must be observed AM Achsma D C25 30 concrete for foundations ER Ground fall protection etc ground 100 mm thick F Fall protection G Drainage layer...

Страница 11: ...Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc 11 5 Erection instruct...

Страница 12: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 12 CAD1 Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc...

Страница 13: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc 13...

Страница 14: ...er 6 2 The equipment has not been installed safely in the following cases Installation of equipment is not complete The protective surface has not been installed Appropriate maintenance work cannot gu...

Страница 15: ...ar Berghausen Germany seiltechnik huck net www huck net CAD1 Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc 15 B Maintenance instructions Adventure Bridge w...

Страница 16: ...EN 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts wh...

Страница 17: ...f stainless steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 8 4...

Страница 18: ...ened and checks carried out to ensure that there are no missing screws 8 12 Preventing equipment use The use of the equipment should be prevented in case of incomplete installa tion disassembly mainte...

Страница 19: ...e equipment 9 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 9 1 3...

Страница 20: ...Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 20 CAD1 Standard 4959 20 Montageanleitungen Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR doc 10 Regular mainten...

Страница 21: ...ar or damage and replace if necessary 11 7 If necessary remove excess padding material from the post footings due to danger of rotting 11 8 Check the surface of wooden parts for damage caused by the w...

Страница 22: ...be necessary to dig out or excavate certain components Zinc paint should be applied to corroded areas and scratches 14 3 Check complete stability check posts bracing foundations etc 14 4 Ascertaining...

Страница 23: ...______ Location _______________________________________________________________________________________ Customer or operator ___________________________________________________________________________...

Страница 24: ......

Страница 25: ...___________________________________________________________ ______________________________________________________________ Competent person in charge __________________________________________________...

Отзывы: