background image

 

Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany 

[email protected]

 

 www.huck.net

 

 

 

20 

\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4687-35\Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR.doc

 

8  General maintenance information 

8.1 

Maintenance intervals 

Maintenance intervals are based on average use. Please note that more 
frequent inspections and/or maintenance are required if the play equipment is 
subject to intensive use. 

8.2 

Inspection frequency 

The frequency of inspections must be based on actual use. Factors that affect 
frequency include vandalism, location (e.g. coastal proximity), air pollution and 
the age of the equipment. 

8.3 

Maintenance products and procedures 

All nuts and bolts are hot-dip galvanised or stainless steel. One of the 
characteristics of stainless steel is that uncontrolled cold welding may occur 
when the nuts are tightened. To prevent this, it is necessary to spray the nuts 
and bolts with Teflon spray or another similar lubricant. 

8.4 

Spare parts 

All spare parts must conform to the manufacturer’s specifications. 

8.5 

Identifying spare parts 

All spare parts are listed in the parts list. The parts list follows the installation 
requirements. 

8.6 

Special instructions for the disposal of individual equipment 

components 

No special instructions are necessary. 

8.7 

Special measures during the break-in period 

No later than 2 weeks after assembly, all screwed connections should be 
checked and tightened if necessary. 

8.8 

Maintenance of protective surfaces 

Surfaces providing fall protection must also be maintained regularly. It is 
particularly important to maintain the correct level of loose surface material 
and add more if necessary. 

 

 

Содержание 4687-35

Страница 1: ...AD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 1 A Assembly instructions Mini Pirates Tower Fortuna Art 4687 35 Operator _____________________________...

Страница 2: ...et www huck net 2 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc Revision history Revision 0 2012 04 20 The first allowed version Assembly instructio...

Страница 3: ...with part numbers 8 4 Erection instructions 13 5 Delivery contents parts list with part numbers 25 6 Post installation checks 32 B Maintenance instructions Mini Pirates Tower Fortuna Art 4687 35 17 7...

Страница 4: ...arts that may be required can be obtained directly from your supplier Please do not hesitate to call your supplier if you have any problems during installation or in case of any other questions Follow...

Страница 5: ...cal views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measur...

Страница 6: ...size 300 400 2000 3000 Other ground materials As recommended by manufacturer 3 Name and overall dimension of the largest component Steel post piece length 3 40 m 102 mm 4 Name and weight of the heavie...

Страница 7: ...of sandy and soft soils the surface measure of foundations have to be enlarged for about 50 7 Assembly time once foundations completed 1 2 hour Required assistants 1 person 8 Any spare parts which may...

Страница 8: ...Ring clamp with bolt M10X100 2 nuts for 102 mm 3 1 Cross frame 102 mm 4 10 Ring clamps with Carriage bolts M10 galv 7 1 Play component 1 8 1 Play component 2 5 5 x 25 mm 9 1 Ring clamp connected to Po...

Страница 9: ...sen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 9 3 2 In symbols Table 3 2 Delivery contents in symbols...

Страница 10: ...lar Berghausen Germany seiltechnik huck net www huck net 10 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc Pos Quantity Symbol 8 2 9 6 10 0 33Liter...

Страница 11: ...any seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 11 Pos Quantity Symbol 111 2 112 2 113 2 M12 114 115 1 sidewalk...

Страница 12: ...any seiltechnik huck net www huck net 12 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc Screw locking device glue all screws nuts and sleeves with lo...

Страница 13: ...eiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 13 4 Erection instruc...

Страница 14: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 14 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 15: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 15...

Страница 16: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 16 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 17: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 17...

Страница 18: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 18 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 19: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 19...

Страница 20: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 20 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 21: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 21...

Страница 22: ...technik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 22 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc Optional Stainless St...

Страница 23: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 23...

Страница 24: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 24 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 25: ...s 5 1 In words Table 3 1 Delivery contents in words Pos Quantity Element Description Size O K Missing 1 1 Steel post 102 mm 1 50 m lg 2 1 Blue platform with rubber ramp 3 1 Stainless steel slide 4a 1...

Страница 26: ...Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 5 2 in Symbolen Tabelle 3 2 Lieferumfang St ckliste mit Teilenummern VA Rutsche Pos St ck zahl Symbol 1a 1 101 6 mm 1 50 m l...

Страница 27: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 27...

Страница 28: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 28 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 29: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 29...

Страница 30: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 30 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc...

Страница 31: ...mo Connect BM Holes must be drilled after installing Gehw Pl Sidewalk flagstone by the customer Upper edge drainaget see drawing F Fall protection O K Upper edge of playing level PS Safety area Round...

Страница 32: ...safely in the following cases Installation of equipment is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 6 3 Removal...

Страница 33: ...A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 17 B Maintenance instructions Mini Pirates...

Страница 34: ...www huck net 18 CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc Revision history Revision 0 2012 04 20 The first allowed version Maiantanance instruct...

Страница 35: ...h EN 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts w...

Страница 36: ...l One of the characteristics of stainless steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or...

Страница 37: ...and checks carried out to ensure that there are no missing screws 8 11 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenanc...

Страница 38: ...the equipment 9 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 9 1...

Страница 39: ...Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 4687 35 Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR doc 23 10 Regular mainte...

Страница 40: ...and replace if necessary 11 7 If necessary remove excess padding material from the post footings due to danger of rotting 11 8 Check the surface of wooden parts for damage caused by the weather or ext...

Страница 41: ...urfaces are safe for operation 14 2 In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint sho...

Страница 42: ...____________ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________...

Страница 43: ......

Страница 44: ...___________________________________________________________ _____________________________________________________________ Competent person in charge ___________________________________________________...

Отзывы: