Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
• www.huck.net
\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4687-35\Mini_PiratenturmFortuna_4687_35_ST_B_L_1_GBR.doc
- 31 -
Version: Mini Pirates Tower-Fortuna
AB
Setting time at least 7-8 days
BS
Drill and counter sink hole for Pos.9 and Pos.4a
D
Concrete C25/30 (for foundations)
Dt
Detail view
Rfa
Assure all clamps are secure
G
Drainage
R
Radius
VO
Pre-assembled
M.Lot !!
Install Pos.1 Vertically level
ML
Mast length above ground level
mo
Connect
BM
Holes must be drilled after installing
Gehw.Pl.
Sidewalk flagstone (by the customer)!
Upper edge
– drainaget (see drawing)
F
Fall protection
O.K
Upper edge of playing level
PS
Safety area
Round off foundation edges (min.R = 100 mm)! Sizes of
fundations are designed for soils class
“4-5” (natural
ground).
Soil class 4: soft to medium plasticity, interleave bound,
with minor portion of stone (portion < 30% with bigger
diameter of 63 mm grain size).
Soil class 5 : ground with soil class 3 and 4 with big
portion of stones (portion > 30% with bigger diameter of
63 mm grain size).
In case of sandy and soft soils, the surface measure of
foundations have to be enlarged for about 50%!
See drawings for details of shortcuts
Содержание 4687-35
Страница 43: ......