1.Unpacking
The telescope is packed in three shipping boxes, as described below. We recommend
keeping the original packaging for the future usage.
Make sure all the parts in the Parts List are present. Be sure to check all boxes
carefully, as some parts are very small. If anything appears to be missing or broken,
immediately email Hubble Optics for assistance.
Box #1, The UL16 main structure
Quantity Description
1
Mirror Box/Rocker/Ground board
1
Upper ring
3
Spider Vanes
1
Secondary spider hub and the diagonal secondary mirror holder
1
Mirror Box, Rocker, and “Ground Board”
1
Focuser L bracket (with 2 M5 x 16 screws)
1
Secondary mirror
1
2" 10:1 dual speed focuser
3
Plastic feet with wing nuts
4
M6 knob screws (20mm long) with wingnuts for the truss tube and upper
ring connection
8
M6 knob screws for the truss tube and mirror box connection
2
M6 knob screws for the ALT bearing assembly
1
Magic nylon tape to hold the sling
3
Brass wire to evenly separate cell support bars
1
Nylon sling belt
3
Center spot ring (spare)
6
Mirror Cell Support Pad
1
8 x 50 finder scope and bracket (option)
1
Shroud (option)
1
Truss Tube Carry Bag (option)
1
5-star artificial star (option)
2
Содержание Ultra Light UL 16
Страница 3: ...Figure 1 Mirror Box Figure 2 Upper Ring 3...
Страница 4: ...Figure 3 Spider Vanes 4...
Страница 5: ...Figure 4 Secondary Spider Hub Diagonal Support Figure 5 Focuser L Bracket Figure 6 14 Knob Screws 5...
Страница 6: ...Box 2 The primary mirror Qty Description 1 Primary Mirror 6...
Страница 11: ...Figure 10 Attach the focuser L bracket to the upper ring Figure 11 Attach the focuser to the L bracket 11...
Страница 13: ...Figure 14 Center the secondary in the focuser drawtube 13...
Страница 23: ...Figure 19 Tighten the knob screws 23...
Страница 25: ...Figure 20 Slide in one slot first 25...
Страница 27: ...2 5 Adjust the Sling After UL16 is fully assembled the sling must be adjusted 27...