5.
Entering through the rear access panel cutout, place the four remaining washers on the anchor bolts
and secure with the ¾-inch hex nuts.
6.
Torque the 3/4-inch hex nuts to 85 ft
lb.
N
OTE
:
The unit must be installed and grounded in accordance with national and local electrical codes.
Increased Windspeed Rating (Optional)
Increase the buried concrete pier depth from 42 inches to 48 inches to obtain a wind speed rating (V
ULT
) of
160mph.
Model 54
X
-001 Strobe and No. 84502-201 Lens Cover Installation
NOTE:
A ¾-inch by ¾-inch M/F extension is provided for installation of the 540-001 or 541-001 strobe.
It is highly recommended that this extension be installed. The extension increases the
installation height of the LED strobe for maximum visibility.
1.
Thread the extension onto
the tower and tighten.
2.
Insert the strobe’s 15-foot
wires through the
extension (when installed)
and the tower’s threaded
nipple and allow the wires
to extend to the base of the
tower (see Figure 8).
3.
Screw the strobe onto the
threaded nipple/extension.
4.
Apply a small amount of
clear RTV silicone sealant
or equivalent to the
threads of each security
screw to reduce the
possibility of rust forming
in the screw threads.
5.
Secure the No. 84502-201
Lens Cover with the four
security screws.
6.
Refer to GAI-Tronics Pub.
42004-499 (Model 540-
001) or 42004-529 (Model
541-001) for detailed
strobe installation
instructions (see Figure 11
and Figure 12 for general
wiring instructions).
N
OTE
:
Pay careful attention to the wire colors for correct wiring.
Figure 8. Strobe Assembly