Pub. 42004-510C 

234/234SBA RED ALERT

®

 Tower Assemblies 

Page 9 of 14 

P:\Standard IOMs - Current Release\42004 Instr. Manuals\42004-510C.docx 

11/19 

5.

 

Entering through the rear access panel cutout, place the four remaining washers on the anchor bolts 
and secure with the ¾-inch hex nuts. 

6.

 

Torque the 3/4-inch hex nuts to 85 ft

lb. 

N

OTE

:

  The unit must be installed and grounded in accordance with national and local electrical codes. 

Increased Windspeed Rating (Optional) 

Increase the buried concrete pier depth from 42 inches to 48 inches to obtain a wind speed rating (V

ULT

) of 

160mph. 

Model 54

X

-001 Strobe and No. 84502-201 Lens Cover Installation 

NOTE:

  A ¾-inch by ¾-inch M/F extension is provided for installation of the 540-001 or 541-001 strobe.  

It is highly recommended that this extension be installed.  The extension increases the 
installation height of the LED strobe for maximum visibility. 

1.

 

Thread the extension onto 
the tower and tighten. 

2.

 

Insert the strobe’s 15-foot 
wires through the 
extension (when installed) 
and the tower’s threaded 
nipple and allow the wires 
to extend to the base of the 
tower (see Figure 8). 

3.

 

Screw the strobe onto the 
threaded nipple/extension. 

4.

 

Apply a small amount of 
clear RTV silicone sealant 
or equivalent to the 
threads of each security 
screw to reduce the 
possibility of rust forming 
in the screw threads. 

5.

 

Secure the No. 84502-201 
Lens Cover with the four 
security screws. 

6.

 

Refer to GAI-Tronics Pub. 
42004-499 (Model 540-
001) or 42004-529 (Model 
541-001) for detailed 
strobe installation 
instructions (see Figure 11 
and Figure 12 fo
r general 
wiring instructions). 

N

OTE

:

  

Pay careful attention to the wire colors for correct wiring. 

 

Figure 8.  Strobe Assembly 

Содержание Gai-Tronics REDA LERT 234

Страница 1: ...Components 1 Model 234 Tower 2 Model 234SBA Tower 2 Installation 2 Pier Foundation Depth and Conduit Entry 4 Concrete Form Construction 4 Anchor Bolt Location 6 Tower Mounting 7 Increased Windspeed R...

Страница 2: ...wer are designed to house a GAI Tronics 39x or 27x series flush mount telephone and a Model 540 001 or 541 001 strobe Both tower assemblies are over 9 feet tall making them easily located by potential...

Страница 3: ...c or Panel Light Assembly 10 33 V dc 1 4 12538 201 Speaker Kit quantity of kits determines audio coverage 1 4 12538 201 Vacancy Kit required when a speaker kit is not utilized i e facing a building Th...

Страница 4: ...ing nuts and washers needed for installation Additional materials required to install the pier are not provided by GAI Tronics but are shown in the installation drawings for reference Determine all co...

Страница 5: ...see Figure 2 for typical conduit arrangements Figure 2 Sample conduit arrangements within tower Concrete Form Construction 1 Place the 24 inch diameter concrete form tube on a bed of crushed stone in...

Страница 6: ...Pub 42004 510C 234 234SBA RED ALERT Tower Assemblies Page 5 of 14 P Standard IOMs Current Release 42004 Instr Manuals 42004 510C docx 11 19 Figure 3 Reinforcement Cage Detail...

Страница 7: ...or bolts a minimum of nine inches into the concrete Anchor bolt positioning is critical for tower body mounting 1 Immediately submerge the anchor bolts into the concrete pier after pouring the concret...

Страница 8: ...or the bolt protrusion dimension Figure 5 Concrete Pier Cross Section Tower Mounting ATTENTION Do not mount the tower body until the concrete has been allowed to cure for a minimum of 24 hours 1 Threa...

Страница 9: ...11 19 Figure 6 Exploded View 4 Verify that a inch minimum air gap exists between the base of the tower and the top of the concrete pier see Figure 7 NOTE The air gap must not be obstructed with soil...

Страница 10: ...s highly recommended that this extension be installed The extension increases the installation height of the LED strobe for maximum visibility 1 Thread the extension onto the tower and tighten 2 Inser...

Страница 11: ...ires will be connected later to the incoming power conductors in accordance with applicable electrical codes Model 84503 302 10 33 V dc Extend the black and the white wires to the base of the tower th...

Страница 12: ...nnection to the electronics paging module before placing the batteries into the tower NOTE Leave the wires from the paging module to the batteries disconnected until ready to power up the unit 2 Secur...

Страница 13: ...42004 Instr Manuals 42004 510C docx 11 19 Power Connections For all component wiring refer to the specific equipment manual and the interconnection diagrams see Figure 11 and Figure 12 Figure 11 Inter...

Страница 14: ...ng by treating it with a phosphoric acid solution intended for this purpose Allow the area to dry 4 Using a cotton swab or small brush paint the prepared surface with an automotive enamel or oil base...

Страница 15: ...02 EMERGENCY reflective label white 25398 003 EMERGENCY standard label cardinal red 25398 013 EMERGENCY standard label black 25398 015 HELP large label white 540 001 Strobe 120 V ac 541 001 Strobe 12...

Страница 16: ...of the Contractor s personnel from the work site Re performance of services shall be Buyer s sole and exclusive remedy and in no event shall GAI Tronics warranty obligations with respect to services e...

Отзывы: