10
Tip: this function is convenient for measuring and detecting only
one phase, saving time.
2
Two level operation directory, corresponding to the first level operation
directory.
NO.
Instructions
2
Set parameters and modify the parameters through “↑↓”keys.
Tip: the cursor in the second level of operation directory, you can
press the "Enter" or "Cancel" key to jump the cursor to the first level of
operation directory.
3
Explanation of selected functions.
4
When the cursor is here, press the "Enter" button to start the
measurement.
In the process of testing, if the instrument detects short circuit, high and low voltage
reverse connection fault, the display screen will pop up the fault alarm box, and stop
measuring.
“The three phase ratio test results" screen is shown below.
NO.
Instructions
1
Corresponding test phases.
2
The corresponding measured variation ratio.
3
Error value of instrument automatic calculation.
4
Measured high and low voltage connection modes and groups.
5
Measured current tap.
6
Menu selection area.
Press the "left and right" button to move the cursor and select the
corresponding function. Press the "Enter" button to perform the current
selected function. Press the "Cancel" button to return to the previous
screen.
Continue the measurement.
Print the current test results by connecting the external printer.