FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
4 Preparations for Power-On Commissioning
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
17
4
Preparations for Power-On
Commissioning
4.1 Tool Preparations
lists the tools required for power-on commissioning.
Table 4-1
Tools
Tools
Phillips screwdriver
Flat-head screwdriver
Utility knife
Multimeter
Electroprobe
Network cable tester
Cable tie
Insulation tape
Marker
ESD gloves
Step ladder (2 m)
ESD wrist strap