background image

20

Huawei Technologies Co., Ltd.

Huawei  Industrial  Base,  Bantian,  Longgang

Shenzhen  518129  People's  Republic  of China

www.huawei.com

Scan here for more documents:

You can also log in to Huawei technical support website:
https://support.huawei.com/enterprise
https://support.huawei.com

Support

Support-E

WeChat

Scan here for technical support (enterprise):

Scan here for technical support (carrier):

Huawei  App Store

Huawei  App Store

Содержание UPS5000-S-1600KVA-FP

Страница 1: ... manual carefully to get familiar with product information and safety precautions 2 Use insulated tools during installation and operation 3 Only engineers certified by Huawei or its agents are allowed to install commission and maintain the UPS Otherwise personal injury or equipment damage may occur and the UPS faults caused are beyond the warranty scope of Huawei Power unit 1 Power unit 2 Bypass u...

Страница 2: ...Q5 1 11 Output circuit breaker of power unit 3 Q5 3 12 Input circuit breaker of power unit 3 Q1 3 Determining the UPS Installation Position 2 1 The UPS can be installed on the channel steel or floor Determine the mounting hole positions using a marking off template unit mm drill holes and install expansion sleeves based on site requirements 2 Installing the UPS Dimensions of the Cabinet Holes Bypa...

Страница 3: ...d input output units and install the connecting plates in the following sequence bottom top and middle 4 Secure the UPS 3 Install the side panels removed from the input and output unit to power unit 1 and power unit 3 A Mounting holes on the channel steel M12x60 bolts B Mounting holes on the floor M12x60 expansion bolts Channel steel or bolts are not included ...

Страница 4: ...s Move a busbar with caution to avoid scratching cabinets Each busbar weighs about 50 kg Be cautious to avoid injury when moving heavy objects Preparation two scaling ladders that are more than one meter high At least two persons are required to carry a busbar At least two persons are required to hold the busbar on the top of the cabinet When moving a busbar hold both ends of the busbar component ...

Страница 5: ...nnect the busbar components numbered 02 and 03 Before installation remove the screws that are partially tightened from the busbar component The two insulators do not need to be secured with screws Busbar Component numbered 03 Busbar component numbered 02 3 Install busbar components numbered 02 and 03 ...

Страница 6: ...l the left sealing plate numbered 08 7 Install the side sealing plate numbered 09 for the input and output unit Busbar component numbered 07 5 Install the busbar component numbered 07 and secure it to the cabinet ...

Страница 7: ...rear sealing plate numbered 11 for the power unit 1 and power unit 2 10 Install the sealing plates numbered 12 for the bypass unit and input and output unit 8 Install the side sealing plate numbered 10 for power unit 3 ...

Страница 8: ... 12 Install the busbar numbered 14 for power unit 3 13 Install the front and rear sealing plates numbered 15 and 16 for input and output unit 2 11 Install the sealing plates numbered 13 for power unit 3 ...

Страница 9: ...9 15 Install supports for the busbar covers 16 Install the sealing plate of battery wiring protective cover for each power unit 14 Install the right sealing plate numbered 17 for power unit 3 ...

Страница 10: ...usbar covers 17 Install mounting plates the left and right mounting plates are numbered 18 Power unit 1 plate Power unit 2 plate Bypass unit plate Input and output unit 1 plate Input and output unit 2 plate Power unit 3 plate ...

Страница 11: ...able scraps may ignite and cause personal injury or device damage After cables have been installed clean the cabinets in a timely manner Keep the cabinets and surrounding environment clean and tidy You need to prepare terminals onsite The stripped length of the copper wire should be the same as that of the part of the terminal that covers the conductor Distances Between the Top Copper Bars of the ...

Страница 12: ...12 Distances Between Top Copper Bars unit mm Copper Bar Specifications unit mm ...

Страница 13: ...put Crimped DT terminals M16 55 mm 120 N m Output Crimped DT terminals M12 35 mm 47 N m PE Crimped DT terminals M12 35 mm 47 N m Equipotential ground point Crimped DT terminals M6 N A 4 5 N m 1 Connect the equipotential ground point and the ground bar in the equipment room 2 Connect the copper bars between the mains input and bypass input N and PE copper bars 3 Perform this step only when the main...

Страница 14: ...l the U V and W copper bars 5 Connect input and output busbars and battery cables based on the top copper bar position diagram 6 Install supports and covers on the top of the protective covers for each power unit ...

Страница 15: ...al PWU1 15 Cabinet Port Bypass Unit Port Power unit 1 XS1 BP XS2 02 BP XS6 connect to the XS6 terminal reserved in the cabinet Power unit 2 XS1 Power unit 3 XS1 BP XS3 Input and output unit 2 bound to input and output unit 1 N A BP XS4 Input and output unit 1 N A BP XS5 9 Connect the signal cables between the power unit and bypass unit 7 Before power on remove the protective covers from the top of...

Страница 16: ...Ensure that the line voltage is in the range of 138 485 V AC and the frequency is in the range of 40 70 Hz After the UPS is powered on initialization begins The monitoring display unit MDU displays the Huawei logo and an initialization progress bar 4 Verifying the Installation 1 Check that there is no foreign matter in the cabinets 2 Remove the paper protective film from the sealing putty After ro...

Страница 17: ...on the Settings Wizard screen the MDU displays the Bypass mode and No battery alarms which do not need to be handled If there is any other alarm you need to rectify the fault c View the system running status diagram on the MDU to check that the UPS is working in bypass mode d Start the inverter on the app The Service Expert app can be downloaded from Google Play and can run on Android The port num...

Страница 18: ...Inv ON b In the displayed login window enter the user name and password and tap c In the displayed dialog box tap OK to start the inverter To ensure system security change the LCD and WebUI passwords after the first login 5 3 Powering On Loads 1 After the inverter starts the UPS works in normal mode The Bypass mode alarm disappears 2 After confirming that the battery strings are properly connected...

Страница 19: ...WebUI choose Monitoring Control and click Inv OFF After confirmation the inverter is shut down Powering Off a Single UPS 6 2 Turn off the the downstream output switch Turn off the UPS input circuit breaker Q1 1 Q1 2 and Q1 3 and output circuit breaker Q5 1 Q5 2 and Q5 3 Turn off the upstream bypass and mains input switches for the UPS Turn off the battery string circuit breaker of each power unit ...

Страница 20: ...China www huawei com Scan here for more documents You can also log in to Huawei technical support website https support huawei com enterprise https support huawei com Support Support E WeChat Scan here for technical support enterprise Scan here for technical support carrier Huawei App Store Huawei App Store ...