Tools and Meters
8)
(M6/M8/M12/M16)
lists only the common tools for installation and cable connection. For more dedicated tools
required, see the corresponding component manuals. Prepare tools based on site requirements.
3.1.3 Preparing Power Cables
The UPS can generate large leakage currents. A circuit breaker that provides leakage
current protection is not recommended.
If multiple UPSs are to be connected in parallel, input and output power cables for each
UPS should have the same length and specifications.
The TN-C system is supported when the input N and PE are connected.
lists the recommended cross-sectional areas for power cables. Note that the currents
listed are measured at a rated voltage of 380 V.
Table 3-2
Recommended cross-sectional areas for power cables
Item
400 kVA
500 kVA
600 kVA
Mains
input
connector
Mains input current (A)
640
800
960
Recommended
cross-sectional
area (mm
2
)
L1
2 x (4 x 185)
3 x (4 x 185)
3 x (4 x 240)
L2
L3
N
PE
185
240
240
Bypass
input
connector
Bypass input current (A)
608
760
912
Recommended
cross-sectional
area (mm
2
)
L1
2 x (4 x 185)
3 x (4 x 185)
3 x (4 x 240)
L2
L3
N
PE
185
240
240