UPS5000-E-(350 kVA-800 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 05 (2018-01-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
85
Figure 3-34
Tightening expansion bolts
Step 5
Install the front, rear, left, and right anchor baffle plates.
Figure 3-35
Installing the front, rear, left, and right anchor baffle plates
Step 6
Remove the front covers of the power distribution subrack from the bypass cabinets, as shown
in
The front covers of the power distribution subrack can be removed only when all the switches are OFF.