Verifying the Installation

1. Check that there is no foreign matter at the bottom of the cabinet, copper bars, and switches.

2. After verifying the installation, reinstall all 

the covers.

3. (Remove the paper protective film from the 

sealing putty.) After routing cables and 
verifying cable connections, seal the gap 
between cables and the cabinet using 
sealing putty.

Dustproof cover 

4. Do not remove the dustproof cover before 

power-on to prevent dust inside the UPS.

Sealing putty

Sealing putty must be used 
as a whole and the gap can 

be sealed only from the top. 

Paper 

protective film 

6

Powering On and Starting the UPS

1. Before powering on the UPS, ensure that the UPS has passed all check items in the 

UPS5000 

Commissioning and Acceptance Report

and Chapter 5.

2. Measure the voltage and frequency of the UPS upstream input switch. The line voltage range is 

138

–485 V AC, and the frequency range is 40–70 Hz.

Powering On the UPS

6.1

Close the upstream bypass and mains input switches.

(Full configuration model) Close the UPS bypass input switch, output switch, and mains input switch.

After the UPS is powered on, initialization begins. The MDU displays the Huawei logo and an 

initialization progress bar.

Содержание UPS5000-E-25 kVA-BF

Страница 1: ...itch The battery switch in the UPS cabinet is used to control internal battery strings and cannot control external battery strings NOTE 1 Before installation read the user manual carefully to get familiar with product information and safety precautions 2 Use insulated tools when installing the equipment 3 Only engineers certified by Huawei or its agent are allowed to install commission and maintai...

Страница 2: ... expansion sleeves 3 Remove the rear cover from the cabinet open the cabinet front door and remove the four rubber plugs from the bottom of the cabinet 5 Reinstall the rear cover for the cabinet 2 Adjust the anchor bolts and ensure that the anchor bolts touch the floor Then level the UPS 4 Secure the UPS Unit mm ...

Страница 3: ... terminals onsite The stripped length of the copper wire should be the same as that of the part of the terminal that covers the conductor UPS Cable Connection Reference 3 1 1 Remove the cover from the power distribution subrack 2 Remove the big cover at the cabinet bottom and drill holes based on site conditions and reinstall the cover The cover can be removed only when the maintenance bypass swit...

Страница 4: ...und cable and power cables Silk Screen Port Description Bolt Specifications Torque 1L1 1L2 1L3 N Input M10x30 26 N m N Battery input M12x45 46 N m U V W N Output M10x30 26 N m PE PE M8x20 13 N m 4 Connect the signal cable ...

Страница 5: ... prevent vibrations and shocks 3 Install the battery modules from the lower layer to the upper layer to prevent falling over due to top heaviness 4 If the battery modules are empty assemble battery 2 Remove the protective cover from the rear of the battery NOTE 4 Install battery modules one by one from the bottom layer to the top layer in the preceding way 3 Push the battery module whose positioni...

Страница 6: ...be used as a whole and the gap can be sealed only from the top Paper protective film 6 Powering On and Starting the UPS 1 Before powering on the UPS ensure that the UPS has passed all check items in the UPS5000 Commissioning and Acceptance Report and Chapter 5 2 Measure the voltage and frequency of the UPS upstream input switch The line voltage range is 138 485 V AC and the frequency range is 40 7...

Страница 7: ...ry capacity and Number of cells must be correctly set Otherwise the UPS running will be affected Output voltage level refers to the line voltage Initial Startup b View the system running status diagram on the MDU to check that the UPS is working in bypass mode c Start the inverter on the app If you do not need to use the app to start the inverter choose System Info Maintenance Inv ON on the MDU Th...

Страница 8: ...hoose System Info Maintenance Inv ON and obtain the Bar code and Verification code Enter the generated password in the password textbox on the MDU to start the inverter Use the app to start the inverter online Yes No start the inverter offline Open the Service Expert app on the mobile phone Open the Service Expert app on the mobile phone On the home screen of the app tap StartUp to access the Set ...

Страница 9: ...choose Common Functions and tap Inv OFF 2 In the displayed dialog box tap Yes to shut down the inverter Shutting Down the Inverter to Transfer the UPS to Bypass Mode 7 1 Powering Off a Single UPS 7 2 Open the downstream output switch and battery string switch Open the UPS input switch Open the upstream input switch 8 Installing Batteries 1 Remove the upper cover from the battery module 2 Connect a...

Страница 10: ...le connection 1 Cable between batteries 2 Cable between the positive terminal of the battery string and the detection board 3 Cable between the negative terminal of the battery string and the detection board 4 Signal cable for the indicator plate 5 Cable tie 6 Cable between the two batteries in the middle of the battery string 4 Install the insulation protective board 5 Reinstall the upper cover o...

Страница 11: ... China www huawei com Scan here for more documents You can also log in to Huawei technical support website http support huawei com enterprise http support huawei com Support Support E WeChat Scan here for technical support enterprise Scan here for technical support carrier Huawei App Store Huawei App Store ...

Отзывы: