Figure 5-9
Import
Step 5
Click
Control Engineering Installation Diagram
. From the displayed dialog box, select the
correct engineering installation diagram mode, as shown in
Figure 5-10
Control Engineering Installation Diagram
----End
Description of Engineering Installation Diagrams
The engineering installation diagram for image stitching commissioning on the left, center, and
right HD displays is the same. In the diagram, there is a horizontal orange line, two curved lines
(one on each side), and a red cross (in the center). Use the engineering installation diagram with
the craft tools for image stitching commissioning. See the
.