SUN2000L-(2KTL-5KTL)
User Manual
7 Operations on the Local FusionHome App
Issue 02 (2017-12-12)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
81
Figure 7-28
Feed Power into Grid
Table 7-6
Description Feed Power into Grid
Parameter
Description
Value Range
charge/discharge power
The power grid will charge
the battery if
Feed Power
into Grid
is enabled.
Feed Power into Grid
is set
to
Disable
by default. If this
function is enabled, comply
with the grid charge
requirements stipulated in
local laws and regulations.
Disable
Enable
----End
7.4.3.4 IPS Check (Only for Italy CEI0-21 Grid Code)
Context
The Italy CEI0-21 grid code requires IPS check for the SUN2000L. During the self-check
process, the SUN2000L consecutively checks the protection thresholds and time for 10-min
overvoltage, level 1 overvoltage, level 1 undervoltage, level 1 overfrequency, and level 1
underfrequency. The SUN2000L shuts down after the check starts, and it restarts after the
check is successful.
Procedure
Step 1
On the
Operation console
screen, choose
Device maintenance
>
IPS check
to access the
IPS check screen.