
SUN2000-(36KTL,42KTL)
User Manual
4 System Installation
Issue Draft A (2016-05-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
16
4
System Installation
4.1 Checking Before Installation
Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such as holes
and cracks, and check the inverter model. If any damage is found or the inverter model is not
what you require, do not unpack the package but contact the dealer as soon as possible.
Figure 4-1
Position of the inverter model label
(1) Position of the model label
You are advised to remove the packing materials within 24 hours before installing the inverter.
Deliverables
After unpacking the inverter, check that the deliverables are intact and complete. If any
damage is found or any component is missing, contact the dealer.
For details about the number of deliverables, see the
Packing List
in the packing case.